Installation Instructions
Table Of Contents
- Contents
- Chapter 1: Introduction
- Chapter 2: New in this release
- Chapter 3: Hardware models
- Chapter 4: Preinstallation checklist
- Chapter 5: Installing the Avaya Virtual Services Platform 7200 Series
- Installation checklist
- Installation fundamentals
- Electrostatic discharge
- Technical specifications
- Package contents
- Installing a power supply
- Removing a power supply
- Installing a fan module
- LED state definitions
- Installing the switch in an equipment rack
- Cable requirements for the VSP 7200
- Installation and removal of transceivers
- Console port pin assignments
- 40GBASE-QSFP+ ports
- Chapter 6: Translations of safety messages
b. Slide the chassis rail to the rear until the rail locks into the standoffs.
c. Make sure the safety tab locks into place.
5. Use the following steps to secure the rack rails to the frame:
a. Orient the rack rail so that the end with the black latch is facing front.
Installing the Avaya Virtual Services Platform 7200 Series
October 2015 Installing the Avaya VSP 7200 Series 44
Comments on this document? infodev@avaya.com










