Installation Instructions
Table Of Contents
- Contents
- Chapter 1: Introduction
- Chapter 2: New in this release
- Chapter 3: Hardware models
- Chapter 4: Preinstallation checklist
- Chapter 5: Installing the Avaya Virtual Services Platform 7200 Series
- Installation checklist
- Installation fundamentals
- Electrostatic discharge
- Technical specifications
- Package contents
- Installing a power supply
- Removing a power supply
- Installing a fan module
- LED state definitions
- Installing the switch in an equipment rack
- Cable requirements for the VSP 7200
- Installation and removal of transceivers
- Console port pin assignments
- 40GBASE-QSFP+ ports
- Chapter 6: Translations of safety messages
3. Lift the locking mechanism on the rack rail to slide the outer section back into the main
section.
4. Use the following steps to attach the chassis rail to the chassis:
a. Orient the chassis rail with the blue release lock towards the front and position the rail
over the standoffs on the chassis.
Installing the switch in an equipment rack
October 2015 Installing the Avaya VSP 7200 Series 43
Comments on this document? infodev@avaya.com










