Installation Instructions
Table Of Contents
- Contents
- Chapter 1: Introduction
- Chapter 2: New in this release
- Chapter 3: Hardware models
- Chapter 4: Preinstallation checklist
- Chapter 5: Installing the Avaya Virtual Services Platform 7200 Series
- Installation checklist
- Installation fundamentals
- Electrostatic discharge
- Technical specifications
- Package contents
- Installing a power supply
- Removing a power supply
- Installing a fan module
- LED state definitions
- Installing the switch in an equipment rack
- Cable requirements for the VSP 7200
- Installation and removal of transceivers
- Console port pin assignments
- 40GBASE-QSFP+ ports
- Chapter 6: Translations of safety messages
2. Use the following steps to detach the chassis rail from the slide’s rack rail:
a. Pull the inner chassis rail and slide it out as far as you can.
b. Slide the white release lock in the direction of the arrow stamped on the lock.
Installing the Avaya Virtual Services Platform 7200 Series
October 2015 Installing the Avaya VSP 7200 Series 42
Comments on this document? infodev@avaya.com










