Installation Instructions
Table Of Contents
- Contents
- Chapter 1: Introduction
- Chapter 2: New in this document
- Chapter 3: Hardware models
- Chapter 4: Preinstallation checklist
- Chapter 5: Installing the Avaya Virtual Services Platform 7200 Series
- Installation checklist
- Installation fundamentals
- Electrostatic discharge
- Technical specifications
- Package contents
- Installing a power supply
- Removing a power supply
- Installing a fan module
- LED state definitions
- Installing the switch in an equipment rack
- Cable requirements for the VSP 7200
- Installation and removal of transceivers
- Console port pin assignments
- 40GBASE-QSFP+ ports
- Software limitations
- Chapter 6: Translations of safety messages
screws one at a time.
9. Use the following steps to secure the rack rails to the frame:
a. Orient the rack rail so that the end with the black retaining latch is in the front of the
rack.
b. Adjust the length of the rack rail so it fits the rack depth by sliding the long rear bracket
into the extension bracket.
Installing the Avaya Virtual Services Platform 7200 Series
November 2016 Installing the Avaya VSP 7200 Series 70
Comments on this document? infodev@avaya.com










