Installation Instructions
Table Of Contents
- Contents
- Chapter 1: Introduction
- Chapter 2: New in this document
- Chapter 3: Hardware models
- Chapter 4: Preinstallation checklist
- Chapter 5: Installing the Avaya Virtual Services Platform 7200 Series
- Installation checklist
- Installation fundamentals
- Electrostatic discharge
- Technical specifications
- Package contents
- Installing a power supply
- Removing a power supply
- Installing a fan module
- LED state definitions
- Installing the switch in an equipment rack
- Cable requirements for the VSP 7200
- Installation and removal of transceivers
- Console port pin assignments
- 40GBASE-QSFP+ ports
- Software limitations
- Chapter 6: Translations of safety messages
6. Use the following steps to secure the rack rails to the frame:
a. Orient the rack rail so that the end with the black retaining latch is facing front.
b. Adjust the length of the rack rail so it fits the rack depth by loosening the two screws on
the rack rail and adjusting the length. Make sure the screws are tight before you install
the slides in the rack.
Installing the switch in an equipment rack
November 2016 Installing the Avaya VSP 7200 Series 57
Comments on this document? infodev@avaya.com










