Installation Instructions
Table Of Contents
- Contents
- Chapter 1: Introduction
- Chapter 2: New in this document
- Chapter 3: Hardware models
- Chapter 4: Preinstallation checklist
- Chapter 5: Installing the Avaya Virtual Services Platform 7200 Series
- Installation checklist
- Installation fundamentals
- Electrostatic discharge
- Technical specifications
- Package contents
- Installing a power supply
- Removing a power supply
- Installing a fan module
- LED state definitions
- Installing the switch in an equipment rack
- Cable requirements for the VSP 7200
- Installation and removal of transceivers
- Console port pin assignments
- 40GBASE-QSFP+ ports
- Software limitations
- Chapter 6: Translations of safety messages
Figure 15: Retaining latches
•
Pin block—The pin block supports equipment racks with different shaped holes.
- For racks with square holes, the pin block fits right into the holes in the rack.
- For racks with large round holes, the pin block retracts halfway when you insert the rail into
the rack.
Installing the switch in an equipment rack
November 2016 Installing the Avaya VSP 7200 Series 51
Comments on this document? infodev@avaya.com










