Installation Instructions
Table Of Contents
- Contents
- Chapter 1: About this Document
- Chapter 2: New in This Document
- Chapter 3: Hardware Models for VSP 7200 Series
- Chapter 4: Preinstallation Checklist
- Chapter 5: Installing the Virtual Services Platform 7200 Series
- Installation checklist
- Installation fundamentals
- Electrostatic discharge
- Technical specifications
- Package contents
- Installing a power supply
- Removing a power supply
- Install a Fan Module
- LED state definitions
- Installing the switch in an equipment rack
- Cable Requirements for the VSP 7200 Series
- Installation and removal of transceivers
- Console port pin assignments
- 40GBASE-QSFP+ ports
- MACsec operational notes
- Viewing hardware information
- Chapter 6: Translations of safety messages
6. Use the following steps to secure the rack rails to the frame:
a. Orient the rack rail so that the end with the black retaining latch is facing front.
b. Adjust the length of the rack rail so it fits the rack depth by loosening the two screws on
the rack rail and adjusting the length. Make sure the screws are tight before you install
the slides in the rack.
Installing the switch in an equipment rack
March 2020 Installing the VSP 7200 Series 53










