Installation Instructions

Table Of Contents
Perform the following procedure to install an external power supply into your switch.
Note:
Avaya VSP 4000 hardware can vary. This procedure only applies to hardware models with
field replaceable power supplies.
1. If a blanking plate covers the required power supply slot, remove the blanking plate
before attempting to insert the power supply.
2. Insert each power supply into a rear power supply slot.
3. Verify that each power supply is fully seated in the slot. Secure the power supply
with the two thumb screws.
Note:
The
switch chassis can prevent an incorrect installation of a power supply. If you
insert a power supply upside down, it will not fully insert and the thumb screws
will not engage.
4. Once you install a power supply, you can proceed with connecting AC power.
Important:
You can hot swap power supplies while the switch is operational. One power supply is
required
for continued switch operation. PoE+ load reductions can occur if you remove one
power supply while the switch is operating with dual power supplies.
Connect AC power
This section explains power cord specifications and how to connect AC power.
Power cord specifications
To connect AC power to the switch, you need an appropriate AC power cord as described in
the following table, also see the following table for plug specifications.
Table 10: International power cord specifications
Country and Plug Specification Specifications Typical Plug
Continental Europe:
220 or 230VAC
50 Hz
Single phase
Installing the Avaya Virtual Services Platform 4000
38 Installation May 2013
Comments? infodev@avaya.com