Installation Instructions

Table Of Contents
Figure 3: Job aid
To install the ESD discharge cable, perform this procedure.
1. Connect the ground lug on the ESD discharge cable to a safe and suitable earth
ground.
2. Connect all RJ-45 cable connectors to the female RJ-45 connector of the ESD
discharge cable for at least 5 seconds, and then connect each RJ-45 cable
connector to the switch.
3. Leave cables connected to the networking equipment. After you connect cables to
networking equipment, the cables do not build up charge.
Environmental requirements
The
following table provides the environmental requirements for the individual switches in this
series. Ensure that the area where you install the switch and where it operates meets these
requirements.
Table 3: Avaya Virtual Services Platform 4000 environmental requirements
Environmental
requirement
Avaya Virtual Services Platform 4000 models
Ambient Temperature 0°C to 50°C (32°F to 104°F), continuous operation
Operating Temperature 0°C to 50°C (32°F to 104°F)
Storage Temperature –40°C to 85°C (-13°F to 158°F)
Operating Humidity 0 to 95 percent noncondensing
Operating Relative
Humidity
10 to 90 percent noncondensing
Installing the Avaya Virtual Services Platform 4000
26 Installation May 2013
Comments? infodev@avaya.com