Installation Instructions

Caution:
Risk of high current and board burn out if battery is replaced by an incorrect type. Dispose of
used batteries according to the instructions.
Warning:
The lithium battery is not field replaceable. It must only be removed and replaced by authorized
personnel. Contact Technical Support for assistance if the battery requires replacement.
Before you begin
Ensure the area where you install and use the Extreme Networks Virtual Services Platform 4000
switch meets the following environmental requirements:
Ambient temperature between 32° and 122° F (0° and 50° C)
Relative humidity between 0% and 95% noncondensing
No nearby heat sources such as hot air vents or direct sunlight
No nearby sources of severe electromagnetic noise
No excessive dust
Adequate power source within six feet; one 15-Amp circuit required for each power supply
At least 2 inches (5.08 cm) on all sides of the switch unit for ventilation
Adequate space at the front and rear of the switch for access to cables
If you are installing a single VSP 4000 switch on a table or shelf, ensure the surface can support at
least 15 to 20 pounds (7 to 9 kilograms).
Installing the Virtual Services Platform 4000
on a table or shelf
You can install a single VSP 4000 switch on any flat surface. The surface must support the
combined weight of the switch and attached cables (from 15 and 20 pounds [7 to 9 kilograms]).
To install a VSP 4000 on a table or shelf, perform this procedure.
Caution:
Do not place an Ethernet Power Supply Unit or Ethernet Redundant Power Supply on top of a
VSP 4000. The switch housing of a VSP 4000 cannot support the weight of these units.
1. Remove the screws that hold the USB cover but do not remove the USB cover.
Caution:
On a factory-supplied 4850GTS series switch, do not remove the USB device cover or
the USB device from the slot. Removing the USB device affects system operation
November 2017 Installation Job Aid for VSP 4850GTS 3