Installation Instructions
Table Of Contents
- Contents
- Chapter 1: Preface
- Chapter 2: New in this document
- Chapter 3: Hardware models
- Chapter 4: Preinstallation checklist
- Chapter 5: Installing the VSP 4450GTX-HT-PWR+
- Installation checklist
- Installation fundamentals
- Electrostatic discharge
- Technical specifications
- Environmental requirements
- Airflow direction
- Package contents
- Installing the Virtual Services Platform 4000 on a table or shelf
- Installing the Virtual Services Platform 4000 in an equipment rack
- Cable requirements for the Virtual Services Platform 4000
- Installation and removal of Small Form Factor Pluggable (SFP) transceivers
- RJ45 connector pin assignments
- Console port pin assignments
- Installing the Virtual Services Platform 4000 power supply
- Connect AC power
- LED state definitions
- Viewing hardware information
- Chapter 6: Translations of safety messages
Table 11: VSP 4450GTX-HT-PWR+ model with 1 PSU
0°C to 50°C 50°C to 70°C
PoE support on 48 ports 23 ports
PoE+ support on 26 ports 13 ports
Table 12: VSP 4450GTX-HT-PWR+ model with 2 PSUs
0°C to 50°C 50°C to 70°C
PoE support on 48 ports 48 ports
PoE+ support on 48 ports 26 ports
• VSP 4450GTX-HT-PWR+ can support 802.3af 17.8W or 32.4W on each port with one power
supply installed. You can add a second power supply for redundancy.
AC power supply specifications
The following table describes the regulatory AC power specifications for the VSP 4450GTX-HT-
PWR+ switch. The regulatory power specifications are based on the maximum rated capacity of the
power supplies and are not based on typical power consumption which is lower.
Table 13: AC power specifications
4450GTX-HT-PWR+
Input Current: 16.66A/8.33A
Input Voltage (rms): 100 to 240VAC at 50 to 60 Hz
Power Consumption: • Without PoE+
- Typical: 100W
- Maximum: 145W
• With PoE+
- Typical power utilization depends on the number
of ports using PoE+.
- Maximum: 553.4W
Thermal Rating: 341.2 BTU/Hr typical and 494.8 BTU/Hr maximum
Inrush Current: 70A maximum
Turn on Condition: 1 second maximum after application of AC power
Efficiency: 70 percent minimum
Connect AC power
This section explains power cord specifications and how to connect AC power.
Connect AC power
August 2018 Installing the Virtual Services Platform 4450GTX-HT-PWR+ 29










