Installation Instructions
Table Of Contents
- Contents
- Chapter 1: Preface
- Chapter 2: New in this document
- Chapter 3: Hardware models
- Chapter 4: Preinstallation checklist
- Chapter 5: Installing the VSP 4450GSX-PWR+ series
- Installation checklist
- Installation fundamentals
- Electrostatic discharge
- Technical specifications
- Environmental requirements
- Airflow direction
- Package contents
- Installing the Virtual Services Platform 4000 on a table or shelf
- Installing the Virtual Services Platform 4000 in an equipment rack
- Cable requirements for the Virtual Services Platform 4000
- Installation and removal of Small Form Factor Pluggable (SFP) transceivers
- RJ45 connector pin assignments
- Console port pin assignments
- Installing the Virtual Services Platform 4000 power supply
- Connect AC power
- LED state definitions
- Viewing hardware information
- Chapter 6: Translations of safety messages
Chapter 2: New in this document
The following sections detail what is new in Installing the Virtual Services Platform 4450GSX-PWR+.
Transceiver support
VSP Operating System software now allows the use of transceivers and direct attach cables from
any vendor, which means that the switch will bring up the port operationally when using any
transceiver. Extreme Networks does not provide support for operational issues related to the use of
third party transceivers and direct attach cables used in the switches.
August 2018 Installing the Virtual Services Platform 4450GSX-PWR+ 9










