Installation Instructions

Installing the Virtual Services Platform 4000 in an
equipment rack
To install an VSP 4000 switch in an equipment rack, perform this procedure.
Note:
A factory-supplied 4450GSX series switch has a USB port but no USB device or cover.
Prerequisites for installing the VSP 4000 in an equipment rack:
Ensure that you have a space of 1.75 inches (4.45 centimeters) in height for each switch in an
EIA or IEC-standard 19-inch (48.2-centimeter) equipment rack.
The rack is bolted to the floor and braced if necessary.
The rack is grounded to the same grounding electrode used by the power service in the area.
The ground path must be permanent and must not exceed 1 Ohm of resistance from the rack
to the grounding electrode.
1. Attach the L-bracket to each side of the switch using a #2 Phillips screwdriver as illustrated
below.
Installing the Virtual Services Platform 4000 in an equipment rack
August 2018 Installing the Virtual Services Platform 4450GSX-PWR+ 23