Installation Instructions
Table Of Contents
- Contents
- Chapter 1: Preface
- Chapter 2: New in this document
- Chapter 3: Hardware models
- Chapter 4: Preinstallation checklist
- Chapter 5: Installing the VSP 4450GSX-PWR+ series
- Installation checklist
- Installation fundamentals
- Electrostatic discharge
- Technical specifications
- Environmental requirements
- Airflow direction
- Package contents
- Installing the Virtual Services Platform 4000 on a table or shelf
- Installing the Virtual Services Platform 4000 in an equipment rack
- Cable requirements for the Virtual Services Platform 4000
- Installation and removal of Small Form Factor Pluggable (SFP) transceivers
- RJ45 connector pin assignments
- Console port pin assignments
- Installing the Virtual Services Platform 4000 power supply
- Connect AC power
- LED state definitions
- Viewing hardware information
- Chapter 6: Translations of safety messages
Chapter 4: Preinstallation checklist
Before you install the VSP 4450GSX-PWR+and VSP 4450GSX-DC, make sure that you complete
the tasks in the preinstallation checklist.
No. Task Description
1. Review the technical specification for
the switch. Make sure that the area
where you install the switch and where
it will operate meet the requirements.
For the physical, electrical, and environmental
specifications, see Technical specifications on
page 19.
2. Verify the power supply unit (PSU)
specifications. Optionally order a
redundant PSU to provide redundancy
and load sharing.
See Power specifications for VSP 4450GSX
PWR on page 30 or DC power supply
specifications on page 30.
To order redundant PSUs, see Hardware
models on page 10 for part numbers.
3. Make sure that you have the following
tools and cables:
• Phillips #2 screwdriver
• RJ45 console port cable
• ESD cable
See Cable requirements for the VSP 4000 on
page 24.
4. Unpack the equipment. Observe ESD precautions when you unpack
the equipment. See Electrostatic discharge on
page 18.
5. Verify the contents of the shipped
package.
See Package contents on page 21 for a
description of the components that are
provided with the switch. If any components
are missing, contact Extreme Networks
support.
6. Make sure that the power cord has the
correct country-specific termination.
7. Prepare the rack. Ensure that there is enough rack space to
accommodate a 2RU switch (8.8 cm).
Ensure that the rack is bolted to the floor and
braced if necessary.
Table continues…
August 2018 Installing the Virtual Services Platform 4450GSX-PWR+ 14