Installation Instructions

Table Of Contents
2. Set the switch on a table or shelf as illustrated below. Allow at least 2 inches (5.1
centimeters) on each side for proper ventilation and at least 5 inches (12.7
centimeters) at the back for power cord clearance.
Installing the Avaya Virtual Services Platform 4000 in an
equipment rack
To install an Avaya VSP 4000 switch in an equipment rack, perform this procedure.
Installing the Avaya Virtual Services Platform 4000 in an equipment rack
Installation February 2014 31