Installation Guide
Table Of Contents
- Extreme SLX 9850-4 Router Hardware Installation Guide
- Preface
- About this Document
- Device Overview
- Preparing for the Installation
- Mounting the Device
- Initial Setup and Verification
- Initial setup and configuration checklist
- Items required
- Providing power to the device
- Establishing a serial connection
- Configuring a static IP address
- Establishing an Ethernet connection
- Customizing the chassis and host names
- Configuring the DNS service
- Setting the date and time
- Verifying correct operation
- Backing up the configuration
- Powering down the device
- Installing cable management kit
- Monitoring the Device
- Management Modules
- Interface Modules
- Power Supply Modules
- Power supply module overview
- Precautions specific to the power supply module
- Time and items required for removal and replacement
- Removing an AC power supply module
- Inserting an AC power supply module
- Removing a DC power supply module
- Inserting a DC power supply module
- Verifying power supply module operation
- High Voltage Power Supply Unit supporting AC and DC Voltages
- Fan Modules
- Switch Fabric Modules
- Transceivers and cables
- Supported transceivers and cables
- Time and items required
- Precautions specific to transceivers and cables
- Cleaning the fiber-optic connectors
- Managing cables
- Installing an SFP+ transceiver
- Replacing an SFP+ transceiver
- Installing a QSFP28 transceiver
- Replacing a QSFP28 transceiver
- Breakout cables
- Verifying transceiver operation
- Hardware Maintenance Schedule
- Brocade SLX 9850 Router Technical Specifications
- System specifications
- Ethernet
- LEDs
- Other
- Weight and physical dimensions
- Environmental requirements
- Power supply specifications (per PSU)
- Power consumption (typical configuration)
- Power consumption (maximum configuration)
- Power consumption (modules) (typical configuration)
- Power consumption (modules) (maximum configuration)
- Data port specifications (Ethernet)
- Serial port specifications (pinout RJ-45)
- Serial port specifications (protocol)
- Memory specifications
- Regulatory compliance (EMC)
- Regulatory compliance (safety)
- Regulatory compliance (environmental)
- Regulatory Statements
- Cautions and Danger Notices
10. Plug the other end of the cable into the power source.
NOTE
Do not connect the device to the network until the IP addresses are
conī¹gured.
For information about power supply LED patterns, refer to Interpreting power supply module LEDs on page 80.
For NEBS-compliant installation with AC and DC
For the NEBS-compliant installation of the Brocade device with AC and DC systems, use a copper ground wire of at least 2 American
Wire Gauge (AWG). The ground wire should have an agency-approved crimped 2-hole lug (provided with the device) attached to one
end, with the other end attached to building ground.
The connector must be crimped with the proper tool, allowing it to be connected to both ground screws on the enclosure. Before
crimping the ground wire into the provided ground lug, ensure the bare copper wire has been cleaned and antioxidant is applied to the
bare wire.
To ensure adequate bonding when attaching the ground lug, a minimum of 55-65 in-lbs of torque is required to be applied to the
mounting hardware used to attach the ground lug.
All bare grounding connection that points to the Brocade device shall be cleaned and coated with an anti-oxidant solution before
connections are made.
Establishing a serial connection
To establish a serial connection to the console port on the device, complete the following steps.
1. Verify that the device is powered on by verifying that all power LED indicators on the management, interface, power supply, and
fan modules display a steady green light.
Establishing a serial connection
Extreme SLX 9850-4 Router Hardware Installation Guide
53-1004399-07 63