Installation Guide
Table Of Contents
- Extreme SLX 9850-4 Router Hardware Installation Guide
- Preface
- About this Document
- Device Overview
- Preparing for the Installation
- Mounting the Device
- Initial Setup and Verification
- Initial setup and configuration checklist
- Items required
- Providing power to the device
- Establishing a serial connection
- Configuring a static IP address
- Establishing an Ethernet connection
- Customizing the chassis and host names
- Configuring the DNS service
- Setting the date and time
- Verifying correct operation
- Backing up the configuration
- Powering down the device
- Installing cable management kit
- Monitoring the Device
- Management Modules
- Interface Modules
- Power Supply Modules
- Power supply module overview
- Precautions specific to the power supply module
- Time and items required for removal and replacement
- Removing an AC power supply module
- Inserting an AC power supply module
- Removing a DC power supply module
- Inserting a DC power supply module
- Verifying power supply module operation
- High Voltage Power Supply Unit supporting AC and DC Voltages
- Fan Modules
- Switch Fabric Modules
- Transceivers and cables
- Supported transceivers and cables
- Time and items required
- Precautions specific to transceivers and cables
- Cleaning the fiber-optic connectors
- Managing cables
- Installing an SFP+ transceiver
- Replacing an SFP+ transceiver
- Installing a QSFP28 transceiver
- Replacing a QSFP28 transceiver
- Breakout cables
- Verifying transceiver operation
- Hardware Maintenance Schedule
- Brocade SLX 9850 Router Technical Specifications
- System specifications
- Ethernet
- LEDs
- Other
- Weight and physical dimensions
- Environmental requirements
- Power supply specifications (per PSU)
- Power consumption (typical configuration)
- Power consumption (maximum configuration)
- Power consumption (modules) (typical configuration)
- Power consumption (modules) (maximum configuration)
- Data port specifications (Ethernet)
- Serial port specifications (pinout RJ-45)
- Serial port specifications (protocol)
- Memory specifications
- Regulatory compliance (EMC)
- Regulatory compliance (safety)
- Regulatory compliance (environmental)
- Regulatory Statements
- Cautions and Danger Notices
Hardware Maintenance Schedule
• Hardware maintenance schedule.............................................................................................................................................................135
Hardware maintenance schedule
Brocade routers require minimal maintenance for hardware components. It is recommended that you perform the following regular
maintenance tasks:
• Clean the ber-optic connectors on a ber-optic transceiver port and the connected ber cable each time you disconnect the
cable.
• Replace the air lters (included with NEBS kits) quarterly or as needed.
You can also replace the following hardware components, as needed:
• All modules (management, interface, and switch fabric modules).
• Fiber-optic transceivers.
• AC power supply modules.
• AC or DC power supply modules.
• Fan modules.
NOTE
The management, interface, and switch fabric modules are dedicated modules, which means that you must install them in
Brocade routers only. If you install these modules in another Brocade device, or you install a module intended for another
Brocade device in a Brocade router, the device and modules will not function properly.
Extreme SLX 9850-4 Router Hardware Installation Guide
53-1004399-07 135