Installation Guide
Table Of Contents
- ExtremeRouting SLX 9850-4 Hardware Installation Guide
- Preface
- About this Document
- Device Overview
- Preparing for the Installation
- Mounting the Device
- Initial Setup and Verification
- Initial setup and configuration checklist
- Items required
- Providing power to the device
- Establishing a serial connection
- Configuring a static IP address
- Establishing an Ethernet connection
- Customizing the chassis and host names
- Configuring the DNS service
- Setting the date and time
- Verifying correct operation
- Backing up the configuration
- Powering down the device
- Installing cable management kit
- Monitoring the Device
- Management Modules
- Interface Modules
- Power Supply Modules
- Power supply module overview
- Precautions specific to the power supply module
- Time and items required for removal and replacement
- Removing an AC power supply module
- Inserting an AC power supply module
- Removing a DC power supply module
- Inserting a DC power supply module
- Verifying power supply module operation
- High Voltage Power Supply Unit supporting AC and DC Voltages
- Fan Modules
- Switch Fabric Modules
- Transceivers and cables
- Supported transceivers and cables
- Time and items required
- Precautions specific to transceivers and cables
- Cleaning the fiber-optic connectors
- Managing cables
- Installing an SFP+ transceiver
- Replacing an SFP+ transceiver
- Installing a QSFP28 transceiver
- Replacing a QSFP28 transceiver
- Breakout cables
- Verifying transceiver operation
- Hardware Maintenance Schedule
- ExtremeRouting SLX 9850 Technical Specifications
- System specifications
- Ethernet
- LEDs
- Other
- Weight and physical dimensions
- Environmental requirements
- Power supply specifications (per PSU)
- Power consumption (typical configuration)
- Power consumption (maximum configuration)
- Power consumption (modules) (typical configuration)
- Power consumption (modules) (maximum configuration)
- Data port specifications (Ethernet)
- Serial port specifications (pinout RJ-45)
- Serial port specifications (protocol)
- Memory specifications
- Regulatory compliance (EMC)
- Regulatory compliance (safety)
- Regulatory compliance (environmental)
- Regulatory Statements
- Cautions and Danger Notices
FIGURE 59 Switch fabric module - SLX 9850-4
1. Power LED: Green - Power OK; O - No power 2. Status LED: Green - Status OK; Amber - Alert; O - Unexpected error
Precautions specic to the switch fabric module
Before you remove a switch fabric module, you must
rst remove the fan module. For more information, refer to Removing a fan module
on page 116.
NOTE
The fan module must be reinstalled within 20 minutes to prevent overheating.
NOTE
The ambient intake temperature of the system must be less than 35 deg C (95 deg F) at sea level to prevent overheating. If the
ambient temperature is greater than 35 deg C, the module installation time must be reduced. Refer to the specic module
removal and installation instructions in this guide for more details.
In addition, wear a wrist grounding strap connected to chassis ground (if the device is plugged in) or a bench ground. Refer to ESD
ground strap connection points on page 88 for the location of the ESD jack.
Precautions specic to the switch fabric module
ExtremeRouting SLX 9850-4 Hardware Installation Guide
120 9035331-02