Installation Guide
Table Of Contents
- ExtremeRouting SLX 9850-8 Hardware Installation Guide
- Preface
- About this Document
- Device Overview
- Preparing for the Installation
- Mounting the Device
- Initial Setup and Verification
- Initial setup and configuration checklist
- Items required
- Providing power to the device
- Establishing a serial connection
- Configuring a static IP address
- Establishing an Ethernet connection
- Customizing the chassis and host names
- Configuring the DNS service
- Setting the date and time
- Verifying correct operation
- Backing up the configuration
- Powering down the device
- Installing cable management kit
- Monitoring the Device
- Management Modules
- Interface Modules
- Power Supply Modules
- Power supply module overview
- Precautions specific to the power supply module
- Time and items required for removal and replacement
- Removing an AC power supply module
- Inserting an AC power supply module
- Removing a DC power supply module
- Inserting a DC power supply module
- Verifying power supply module operation
- High Voltage Power Supply Unit supporting AC and DC Voltages
- Fan Modules
- Switch Fabric Modules
- Transceivers and cables
- Supported transceivers and cables
- Time and items required
- Precautions specific to transceivers and cables
- Cleaning the fiber-optic connectors
- Managing cables
- Installing an SFP+ transceiver
- Replacing an SFP+ transceiver
- Installing a QSFP28 transceiver
- Replacing a QSFP28 transceiver
- Breakout cables
- Verifying transceiver operation
- Hardware Maintenance Schedule
- ExtremeRouting SLX 9850 Technical Specifications
- System specifications
- Ethernet
- LEDs
- Other
- Weight and physical dimensions
- Environmental requirements
- Power supply specifications (per PSU)
- Power consumption (typical configuration)
- Power consumption (maximum configuration)
- Power consumption (modules) (typical configuration)
- Power consumption (modules) (maximum configuration)
- Data port specifications (Ethernet)
- Serial port specifications (pinout RJ-45)
- Serial port specifications (protocol)
- Memory specifications
- Regulatory compliance (EMC)
- Regulatory compliance (safety)
- Regulatory compliance (environmental)
- Regulatory Statements
- Cautions and Danger Notices
Initial Setup and Verication
• Initial setup and conguration checklist....................................................................................................................................................57
• Items required..................................................................................................................................................................................................... 58
• Providing power to the device......................................................................................................................................................................58
• Establishing a serial connection...................................................................................................................................................................64
• Conguring a static IP address.................................................................................................................................................................... 66
• Establishing an Ethernet connection......................................................................................................................................................... 68
• Customizing the chassis and host names...............................................................................................................................................69
• Conguring the DNS service........................................................................................................................................................................70
• Setting the date and time............................................................................................................................................................................... 70
• Verifying correct operation.............................................................................................................................................................................72
• Backing up the conguration........................................................................................................................................................................73
• Powering down the device.............................................................................................................................................................................73
• Installing cable management kit..................................................................................................................................................................74
Initial setup and conguration checklist
Use the procedures in the following table to initially congure and setup the device, verify correct operation, and back up the
conguration.
TABLE 18 Initial setup and
conguration checklist
Task Task details or additional information
Attach a management station, establish a serial connection, and change
the default passwords (optional).
Refer to Establishing a serial connection on page 64. After completing
this task, log in to the serial port to congure the device.
Set the IP address, subnet mask, and the default gateway IP address. Use the chassis virtual-ip or chassis virtual-ipv6 commands to congure
an IP address. For more information, refer to Conguring a static IP
address on page 66.
Establish an Ethernet connection. By establishing an Ethernet connection, you can complete the device
conguration using a serial or Telnet session. Refer to Establishing an
Ethernet connection on page 68 for more information.
Customize the chassis and host names. Use the switch-attributes chassis-name and switch-attributes host-
name commands to change the default router name. For more
information, refer to Customizing the chassis and host names on page
69
Set the date and time.
• Use the clock set command to set the date and time.
• Use the clock timezone command to set the time zone.
• After you congure the system time, use commands in NTP
conguration mode to synchronize the time with an external
NTP server.
Refer to Setting the date and time on page 70 for more information. For
detailed command information, refer to Extreme SLX-OS Management
Conguration Guide for the SLX 9850 Router .
Optional: Congure the DNS service. Use the ip dns domain-name and, if required, theip dns name-server
command to create DNS server entries. Refer to Extreme SLX-OS
Security Conguration Guide for the SLX 9850 Router for more
information.
Verify that the device operates correctly.
• Check the LEDs to verify operation of module components in
the device. Refer to Interpreting management module LEDs on
page 75, Interpreting interface module LEDs on page 77,
ExtremeRouting SLX 9850-8 Hardware Installation Guide
9035475-02 Rev AA 57