Installation Guide
Table Of Contents
- ExtremeRouting SLX 9850-8 Hardware Installation Guide
- Preface
- About this Document
- Device Overview
- Preparing for the Installation
- Mounting the Device
- Initial Setup and Verification
- Initial setup and configuration checklist
- Items required
- Providing power to the device
- Establishing a serial connection
- Configuring a static IP address
- Establishing an Ethernet connection
- Customizing the chassis and host names
- Configuring the DNS service
- Setting the date and time
- Verifying correct operation
- Backing up the configuration
- Powering down the device
- Installing cable management kit
- Monitoring the Device
- Management Modules
- Interface Modules
- Power Supply Modules
- Power supply module overview
- Precautions specific to the power supply module
- Time and items required for removal and replacement
- Removing an AC power supply module
- Inserting an AC power supply module
- Removing a DC power supply module
- Inserting a DC power supply module
- Verifying power supply module operation
- High Voltage Power Supply Unit supporting AC and DC Voltages
- Fan Modules
- Switch Fabric Modules
- Transceivers and cables
- Supported transceivers and cables
- Time and items required
- Precautions specific to transceivers and cables
- Cleaning the fiber-optic connectors
- Managing cables
- Installing an SFP+ transceiver
- Replacing an SFP+ transceiver
- Installing a QSFP28 transceiver
- Replacing a QSFP28 transceiver
- Breakout cables
- Verifying transceiver operation
- Hardware Maintenance Schedule
- ExtremeRouting SLX 9850 Technical Specifications
- System specifications
- Ethernet
- LEDs
- Other
- Weight and physical dimensions
- Environmental requirements
- Power supply specifications (per PSU)
- Power consumption (typical configuration)
- Power consumption (maximum configuration)
- Power consumption (modules) (typical configuration)
- Power consumption (modules) (maximum configuration)
- Data port specifications (Ethernet)
- Serial port specifications (pinout RJ-45)
- Serial port specifications (protocol)
- Memory specifications
- Regulatory compliance (EMC)
- Regulatory compliance (safety)
- Regulatory compliance (environmental)
- Regulatory Statements
- Cautions and Danger Notices
Initial Setup and Verication.......................................................................................................................................................................................... 57
Initial setup and conguration checklist......................................................................................................................................................................................... 57
Items required...........................................................................................................................................................................................................................................58
Providing power to the device........................................................................................................................................................................................................... 58
Connecting an AC power cord................................................................................................................................................................................................. 59
Connecting a DC power cord................................................................................................................................................................................................... 61
For NEBS-compliant installation with AC and DC..........................................................................................................................................................63
Establishing a serial connection........................................................................................................................................................................................................64
Conguring a static IP address..........................................................................................................................................................................................................66
Conguring IPv6 address ......................................................................................................................................................................................................... 66
Establishing an Ethernet connection...............................................................................................................................................................................................68
Customizing the chassis and host names....................................................................................................................................................................................69
Conguring the DNS service............................................................................................................................................................................................................. 70
Setting the date and time.....................................................................................................................................................................................................................70
Setting the clock (date and time)............................................................................................................................................................................................. 70
Time zones.......................................................................................................................................................................................................................................71
Time synchronization................................................................................................................................................................................................................... 71
Synchronizing local time using NTP......................................................................................................................................................................................71
Setting the time zone................................................................................................................................................................................................................... 72
Verifying correct operation.................................................................................................................................................................................................................. 72
Backing up the conguration............................................................................................................................................................................................................. 73
Powering down the device.................................................................................................................................................................................................................. 73
Installing cable management kit........................................................................................................................................................................................................74
Monitoring the Device..................................................................................................................................................................................................... 75
Monitoring Overview............................................................................................................................................................................................................................. 75
Interpreting management module LEDs...................................................................................................................................................................................... 75
Interpreting interface module LEDs................................................................................................................................................................................................ 77
Interpreting power supply module LEDs...................................................................................................................................................................................... 80
Interpreting fan module LEDs........................................................................................................................................................................................................... 83
Interpreting switch fabric module LEDs........................................................................................................................................................................................ 84
Management Modules.....................................................................................................................................................................................................87
Management module overview.........................................................................................................................................................................................................87
Front panel and port description............................................................................................................................................................................................. 87
Precautions specic to the management modules.................................................................................................................................................................. 88
ESD ground strap connection points..............................................................................................................................................................................................88
Time and items required for installation and replacement.....................................................................................................................................................90
Removing a management module..................................................................................................................................................................................................91
Installing a management module.....................................................................................................................................................................................................91
Verifying management module operation....................................................................................................................................................................................92
Interface Modules.............................................................................................................................................................................................................93
Interface module overview .................................................................................................................................................................................................................93
Front panel and port description............................................................................................................................................................................................. 93
Precautions specic to the interface modules............................................................................................................................................................................ 95
Time and items required for installation and replacement.....................................................................................................................................................95
Inserting an interface module.............................................................................................................................................................................................................95
Removing or replacing an interface module................................................................................................................................................................................97
Verifying interface module operation..............................................................................................................................................................................................98
Power Supply Modules....................................................................................................................................................................................................99
ExtremeRouting SLX 9850-8 Hardware Installation Guide
4 9035475-02 Rev AA