Installation Guide
Table Of Contents
- Table of Contents
- Preface
- 1: Overview
- 2: Hardware Installation
- 3: Basic Configuration Using the Management Interface
- 4: NX-5500 Specifications
- 5: Regulatory Information
- Regulatory Information
- Radio Frequency Interference Requirements - FCC
- Radio Frequency Interference Requirements - Canada
- CE Marking and European Area (EEA)
- Statement of Compliance
- Japan (VCCI) - Voluntary Control Council for Interference Class A ITE
- Korea Warning Statement for Class A ITE
- Chinese Warning Statement for Class A ITE
- Waste Electrical and Electronic Equipment
- Turkish WEEE Statement of Compliance
- End-User Software License Agreement
- China RoHS Compliance
- Regulatory Information
2 Hardware Installation
Warnings
Cautionary Statements
Safety Instructions for Rack Mount Installations
Site Preparation
NX-5500 Integrated Services Platform Installation Procedure
The following figure represents the front of the NX-5500:
To prepare for the installation:
1 Match the model number on the purchase order with the model numbers in the packing list and on
the NX-5500.
2 Verify the contents of the box include the NX-5500 and the included hardware matches the package
contents.
Part Number
Description
NX-5500-100R0-WR NX-5500 Integrated Services Platform
Warnings
•
Read all installation instructions and verify correct equipment installation before connecting the
appliance to its power source.
•
Remove jewelry and watches before installing this equipment.
•
Verify the unit is grounded before connecting it to the power source.
•
Verify any device connected to this unit is properly wired and grounded.
•
Connect all power cords to a properly wired and grounded electrical circuit.
•
Verify the electrical circuits have appropriate overload protection.
•
Attach only approved power cords to the device.
•
Verify the power connector and socket are accessible at all times during the operation of the
equipment.
NX-5500 Integrated Services Platform Installation Guide 9