Installation Guide
Table Of Contents
- ExtremeSwitching CES 2000 Series and ExtremeRouting CER 2000 Series Hardware Installation Guide
- Preface
- About This Document
- Product Overview
- Introduction
- Product overview
- Software features
- Upgrade applications
- Hardware features
- CES 2000 Series 2024C-4X
- CES 2000 Series 2024F-4X
- CES 2000 Series 2024C
- CES 2000 Series 2024F
- CES 2000 Series 2048C
- CES 2000 Series 2048CX
- CES 2000 Series 2048F
- CES 2000 Series 2048FX
- CER 2000 Series 2024C
- CER 2000 Series 2024F
- CER 2000 Series 2048C
- CER 2000 Series 2048CX
- CER 2000 Series 2048F
- CER 2000 Series 2048FX
- Control features
- Network interfaces
- Power supplies
- Cooling system and fans
- Connecting to a Network Device
- Installation
- Device Management Applications Familiarization
- Hardware Specifications
- Hardware Maintenance
- Hardware maintenance schedule
- Power supply replacement
- 10-Gigabit Ethernet module installation or replacement
- Replacing the fan tray
- Copper or Fiber optic module replacement
- Fiber optic connector cleaning
- Regulatory Statements
- Caution and Danger Notices
Summary of installation tasks
Follow the steps listed below to install your Extreme device. Details for each of the steps highlighted below are provided in this chapter
and in the following chapter.
TABLE 8 Summary of installation tasks
Task number Task Where to nd more information
1 Ensure that the physical environment that will
host the device has the proper cabling and
ventilation.
Installation site preparation on page 44
2 Optionally insert a second or redundant power
supply. If you need to install a power supply, it
may be easier to install it before mounting the
device, although the power supplies are "hot
swappable", and can be installed or removed
after the device is mounted and powered-on.
Redundant power supply installation on page
45
3 Install the Extreme device in an equipment rack. Device installation on page 51
4 Once the device is physically installed, plug the
device into a nearby power source that adheres
to the regulatory requirements outlined in this
manual.
System power on page 56
5 Verify that the system LEDs are registering the
proper LED state after power-on of the system.
Operation verication on page 57
6 Attach a terminal or PC to the device. This will
enable you to congure the device through the
Command Line Interface (CLI).
PC or terminal attachment on page 59
7 No default password is assigned to the CLI. For
additional access security, assign a password.
Summary of installation tasks
8 Before connecting to the device, you need to
congure an interface IP address to the subnet
on which it will be located. Initial IP address
conguration is performed using the CLI with a
direct serial connection. Subsequent IP address
conguration can be performed using the
command line interface.
Summary of installation tasks
9 Once you power on the device and assign IP
addresses, the system is ready to accept
network connections.
Summary of installation tasks
10 Secure access to the device. Multi-Service IronWare Security Guide
Installation precautions
Follow these precautions when installing the unit.
DANGER
Batteries used for RTC/NVRAM backup are not located in operator-access areas. There is a risk of explosion if a battery
is replace by an incorrect type. Dispose of used components with batteries according to local ordinance and regulations.
DANGER
All ber-optic interfaces use Class 1 lasers.
Summary of installation tasks