Installation Guide
Table Of Contents
- Contents
- About this Document
- Product Overview
- Installing a Brocade MLX Router
- Installation precautions
- Installing 2x100GbE interface modules in Brocade MLX routers
- Installing a Brocade MLX-4 router
- Installing a Brocade MLX-8 router
- Installing a Brocade MLX-16 router
- Installing a Brocade MLX-32 router
- Installing a Brocade MLX-32 router
- Preparing the installation site
- Brocade MLX-32 router shipping carton contents
- Unpacking your Brocade MLX-32 router
- Installing a Brocade MLX-32 router in a rack
- Installing Brocade MLX-32 router modules
- Brocade MLX-32 cable management
- Accessing modules for service
- Installing power supplies in a Brocade MLX-32 router
- Connecting AC power
- Connecting DC power
- Removing Brocade MLX-32 router DC power supplies
- Final steps
- Attaching a management station
- Activating the power source
- Verifying proper operation
- Installing a NetIron XMR Router
- Installation precautions
- Installing 2x100GbE interface modules in NetIron XMR routers
- Installing a NetIron XMR 4000 router
- Installing a NetIron XMR 8000 router
- Installing a NetIron XMR 16000 router
- Installing a NetIron XMR 32000 router
- Preparing the installation site
- Unpacking a NetIron XMR 32000 router
- Installing a NetIron XMR 32000 router in a rack
- Installing NetIron XMR 32000 modules
- NetIron XMR 32000 cable management
- Accessing modules for service
- Installing NetIron XMR 32000 router power supplies
- Removing NetIron XMR 32000 router DC power supplies
- Final steps
- Attaching a management station
- Activating the power source
- Verifying proper operation
- Using Brocade Structured Cabling Components
- Cable cinch overview
- mRJ21 procedures
- RJ45 procedures
- Cable cinch with one group of RJ45 cables
- Cable cinch with two groups of RJ45 cables
- Cable cinch with three groups of RJ45 cables
- Cable cinch with four groups of RJ45 cables
- Cable cinch with five groups of RJ45 cables
- Cable cinch with six groups of RJ45 cables
- Cable cinch with seven groups of RJ45 cables
- Cable cinch with eight groups of RJ45 cables
- Connecting a Router to a Network Device
- Managing Routers and Modules
- Managing the device
- Enabling and disabling a DC Power Source
- Disabling and re-enabling power to interface modules
- Monitoring I2C failures on management modules
- Displaying device status and temperature readings
- Displaying the Syslog configuration and static and dynamic buffers
- MP Presence from LP Detection (Headless Router Operation)
- Rolling Reboot
- Line Module Configuration Deletion in Interactive Boot Mode
- Managing switch fabric modules
- Managing the cooling system
- Managing interface modules
- Monitoring Link Status
- Using alarms to collect and monitor device status
- Displaying MR2 management module memory usage
- Enabling and disabling management module CPU usage calculations
- Displaying management module CPU usage
- Removing MAC address entries
- Simplified Upgrade
- Managing the device
- Maintenance and Field Replacement
- Hardware Specifications
- Regulatory Statements
- Caution and Danger Notices
Brocade MLX Series and Brocade NetIron XMR Installation Guide 67
53-1004195-03
Installing a Brocade MLX-16 router
Preparing the installation site
Before installing the router, plan the location and orientation relative to other devices and equipment. For cooling purposes, allow a
minimum of six inches of space between the sides, front, and the back of the router and walls or other obstructions. If a router is installed
in a perforated enclosure, the perforations must cover at least 60 percent of the surface.
Ensure that the proper power and network cabling is installed at the site. For information about cabling, refer to “Installing Brocade
MLX-16 router power supplies” on page 78, “Attaching a management station” on page 120, and “Connecting the router to a network
device” on page 209.
Unpacking a Brocade MLX-16 router
The Brocade MLX-16 router ships with the following items:
•
Switch fabric modules installed in the slots marked SF, and slot blanks installed in all empty module slots.
•
Insertion or extraction tool for use with RJ45 and fiber-optic connectors.
If any of these items are missing, contact the place of purchase.
Remove your Brocade MLXe-16 router from the shipping carton. Save the shipping carton and packing materials in case you need to
move or ship the router at a later time.
Lifting guidelines for Brocade MLX-16 routers
A fully-populated Brocade MLX-16 device is heavy. TWO PEOPLE ARE REQUIRED WHEN LIFTING,
HANDLING, OR MOUNTING THESE DEVICES.
Follow these guidelines for lifting and moving your Brocade MLX-16 router:
•
Before lifting or moving the router, disconnect all external cables.
•
Do not attempt to lift a fully configured router by yourself. Use two people to lift the router.
•
It is recommended that you remove router components before installing the router in a rack.
Installing a Brocade MLX-16 router in a rack
Make sure the rack or cabinet housing the device is adequately secured to prevent it from becoming
unstable or falling over.
Mount the devices you install in a rack or cabinet as low as possible. Place the heaviest device at the
bottom and progressively place lighter devices above.
You can install up the three Brocade MLX-16 routers in a standard 19-inch (EIA310-D) rack. It is recommended that you install your
router in a rack before you install any router components.