FIGURE 32 Port covers and connector covers
6. Insert the module into the slot until the connectors securely engage the backplane.
In 4- and 8-slot devices, the modules are installed horizontally. In 16- and 32-slot devices the modules are installed vertically.
Figure 33 and Figure 34 show how to install 2x100G modules in horizontal and vertical slots (4-slot and 16-slot devices are
shown, but the process is the same for 8-slot and 32-slot devices).
NOTE
The 2x100G interface module is sensitive to dust and debris. Keep the optics covers in place until you are ready to connect
the fiber cable. Clean all fiber cables properly before you connect them to the 2x100G interface module.
FIGURE 33 Installing 2x100G modules in a 4- or 8-slot device (4-slot shown)