Installation Guide
Table Of Contents
- Contents
- About this Document
- Product Overview
- Installing a Brocade MLX Router
- Installation precautions
- Installing 2x100GbE interface modules in Brocade MLX routers
- Installing a Brocade MLX-4 router
- Installing a Brocade MLX-8 router
- Installing a Brocade MLX-16 router
- Installing a Brocade MLX-32 router
- Installing a Brocade MLX-32 router
- Preparing the installation site
- Brocade MLX-32 router shipping carton contents
- Unpacking your Brocade MLX-32 router
- Installing a Brocade MLX-32 router in a rack
- Installing Brocade MLX-32 router modules
- Brocade MLX-32 cable management
- Accessing modules for service
- Installing power supplies in a Brocade MLX-32 router
- Connecting AC power
- Connecting DC power
- Removing Brocade MLX-32 router DC power supplies
- Final steps
- Attaching a management station
- Activating the power source
- Verifying proper operation
- Installing a NetIron XMR Router
- Installation precautions
- Installing 2x100GbE interface modules in NetIron XMR routers
- Installing a NetIron XMR 4000 router
- Installing a NetIron XMR 8000 router
- Installing a NetIron XMR 16000 router
- Installing a NetIron XMR 32000 router
- Preparing the installation site
- Unpacking a NetIron XMR 32000 router
- Installing a NetIron XMR 32000 router in a rack
- Installing NetIron XMR 32000 modules
- NetIron XMR 32000 cable management
- Accessing modules for service
- Installing NetIron XMR 32000 router power supplies
- Removing NetIron XMR 32000 router DC power supplies
- Final steps
- Attaching a management station
- Activating the power source
- Verifying proper operation
- Using Brocade Structured Cabling Components
- Cable cinch overview
- mRJ21 procedures
- RJ45 procedures
- Cable cinch with one group of RJ45 cables
- Cable cinch with two groups of RJ45 cables
- Cable cinch with three groups of RJ45 cables
- Cable cinch with four groups of RJ45 cables
- Cable cinch with five groups of RJ45 cables
- Cable cinch with six groups of RJ45 cables
- Cable cinch with seven groups of RJ45 cables
- Cable cinch with eight groups of RJ45 cables
- Connecting a Router to a Network Device
- Managing Routers and Modules
- Managing the device
- Enabling and disabling a DC Power Source
- Disabling and re-enabling power to interface modules
- Monitoring I2C failures on management modules
- Displaying device status and temperature readings
- Displaying the Syslog configuration and static and dynamic buffers
- MP Presence from LP Detection (Headless Router Operation)
- Rolling Reboot
- Line Module Configuration Deletion in Interactive Boot Mode
- Managing switch fabric modules
- Managing the cooling system
- Managing interface modules
- Monitoring Link Status
- Using alarms to collect and monitor device status
- Displaying MR2 management module memory usage
- Enabling and disabling management module CPU usage calculations
- Displaying management module CPU usage
- Removing MAC address entries
- Simplified Upgrade
- Managing the device
- Maintenance and Field Replacement
- Hardware Specifications
- Regulatory Statements
- Caution and Danger Notices
Brocade MLX Series and Brocade NetIron XMR Installation Guide 253
53-1004195-03
Replacing an interface module
FIGURE 153Inserting a compact flash card in the MR2 management module
Replacing an interface module
You can remove or replace interface modules while the router is powered on and running. For more information on module slot locations,
refer to “Product Overview”.
NOTE
It is not recommended that you hot-swap an interface module that is running a software image older or newer than the image on
the management module. Although the management module will attempt to sync the application image on the interface module,
it may not be able to sync older FPGA images. In this case the interface module may attempt to continuously reload. Always
upgrade or downgrade the FPGA images on replacement interface modules to match the software version on the management
module before you install the interface modules in your device.
For information about how to install a new or replacement module, refer to the installation chapter for your router model.
If you are hot-swapping a component, allow a minimum of two seconds after a component has been
removed before inserting a replacement component in the same slot.
Removing and replacing an interface module
To remove or replace an interface module, see the module instructions in the installation chapter that is appropriate for your router model.