Installation Guide
Table Of Contents
- Contents
- About this Document
- Product Overview
- Installing a Brocade MLX Router
- Installation precautions
- Installing 2x100GbE interface modules in Brocade MLX routers
- Installing a Brocade MLX-4 router
- Installing a Brocade MLX-8 router
- Installing a Brocade MLX-16 router
- Installing a Brocade MLX-32 router
- Installing a Brocade MLX-32 router
- Preparing the installation site
- Brocade MLX-32 router shipping carton contents
- Unpacking your Brocade MLX-32 router
- Installing a Brocade MLX-32 router in a rack
- Installing Brocade MLX-32 router modules
- Brocade MLX-32 cable management
- Accessing modules for service
- Installing power supplies in a Brocade MLX-32 router
- Connecting AC power
- Connecting DC power
- Removing Brocade MLX-32 router DC power supplies
- Final steps
- Attaching a management station
- Activating the power source
- Verifying proper operation
- Installing a NetIron XMR Router
- Installation precautions
- Installing 2x100GbE interface modules in NetIron XMR routers
- Installing a NetIron XMR 4000 router
- Installing a NetIron XMR 8000 router
- Installing a NetIron XMR 16000 router
- Installing a NetIron XMR 32000 router
- Preparing the installation site
- Unpacking a NetIron XMR 32000 router
- Installing a NetIron XMR 32000 router in a rack
- Installing NetIron XMR 32000 modules
- NetIron XMR 32000 cable management
- Accessing modules for service
- Installing NetIron XMR 32000 router power supplies
- Removing NetIron XMR 32000 router DC power supplies
- Final steps
- Attaching a management station
- Activating the power source
- Verifying proper operation
- Using Brocade Structured Cabling Components
- Cable cinch overview
- mRJ21 procedures
- RJ45 procedures
- Cable cinch with one group of RJ45 cables
- Cable cinch with two groups of RJ45 cables
- Cable cinch with three groups of RJ45 cables
- Cable cinch with four groups of RJ45 cables
- Cable cinch with five groups of RJ45 cables
- Cable cinch with six groups of RJ45 cables
- Cable cinch with seven groups of RJ45 cables
- Cable cinch with eight groups of RJ45 cables
- Connecting a Router to a Network Device
- Managing Routers and Modules
- Managing the device
- Enabling and disabling a DC Power Source
- Disabling and re-enabling power to interface modules
- Monitoring I2C failures on management modules
- Displaying device status and temperature readings
- Displaying the Syslog configuration and static and dynamic buffers
- MP Presence from LP Detection (Headless Router Operation)
- Rolling Reboot
- Line Module Configuration Deletion in Interactive Boot Mode
- Managing switch fabric modules
- Managing the cooling system
- Managing interface modules
- Monitoring Link Status
- Using alarms to collect and monitor device status
- Displaying MR2 management module memory usage
- Enabling and disabling management module CPU usage calculations
- Displaying management module CPU usage
- Removing MAC address entries
- Simplified Upgrade
- Managing the device
- Maintenance and Field Replacement
- Hardware Specifications
- Regulatory Statements
- Caution and Danger Notices
Brocade MLX Series and Brocade NetIron XMR Installation Guide 137
53-1004195-03
Installing a NetIron XMR 4000 router
FIGURE 93 Shipping screw locations
Follow these steps to mount a NetIron XMR 4000 router in a rack.
1. Determine the position of each router in the rack. For example, place routers with the fewest modules near the top of the rack,
routers with more modules near the middle of the rack, and fully populated routers near the bottom of the rack.
2. Position two of the four mounting screws for each router according to the spacings of the keyhole slots on the mounting
brackets, as shown in Figure 94. When tightening the mounting screws in the rack post, leave approximately 1/4 inch clearance
between the back of the screw head and the rack post.
FIGURE 94 Positioning the mounting screws in rack posts
3. Mount the lowest router in the rack as shown in Figure 95. Slip the wide portion of each keyhole slot over the corresponding
mounting screw in the rack. Two people may be required to perform this task.
1 Front 3 Shipping screws
2Rear
1 Unequal flange equipment rack 2 Network equipment rack