Installation Guide
Table Of Contents
- Contents
- About this Document
- Product Overview
- Installing a Brocade MLX Router
- Installation precautions
- Installing 2x100GbE interface modules in Brocade MLX routers
- Installing a Brocade MLX-4 router
- Installing a Brocade MLX-8 router
- Installing a Brocade MLX-16 router
- Installing a Brocade MLX-32 router
- Installing a Brocade MLX-32 router
- Preparing the installation site
- Brocade MLX-32 router shipping carton contents
- Unpacking your Brocade MLX-32 router
- Installing a Brocade MLX-32 router in a rack
- Installing Brocade MLX-32 router modules
- Brocade MLX-32 cable management
- Accessing modules for service
- Installing power supplies in a Brocade MLX-32 router
- Connecting AC power
- Connecting DC power
- Removing Brocade MLX-32 router DC power supplies
- Final steps
- Attaching a management station
- Activating the power source
- Verifying proper operation
- Installing a NetIron XMR Router
- Installation precautions
- Installing 2x100GbE interface modules in NetIron XMR routers
- Installing a NetIron XMR 4000 router
- Installing a NetIron XMR 8000 router
- Installing a NetIron XMR 16000 router
- Installing a NetIron XMR 32000 router
- Preparing the installation site
- Unpacking a NetIron XMR 32000 router
- Installing a NetIron XMR 32000 router in a rack
- Installing NetIron XMR 32000 modules
- NetIron XMR 32000 cable management
- Accessing modules for service
- Installing NetIron XMR 32000 router power supplies
- Removing NetIron XMR 32000 router DC power supplies
- Final steps
- Attaching a management station
- Activating the power source
- Verifying proper operation
- Using Brocade Structured Cabling Components
- Cable cinch overview
- mRJ21 procedures
- RJ45 procedures
- Cable cinch with one group of RJ45 cables
- Cable cinch with two groups of RJ45 cables
- Cable cinch with three groups of RJ45 cables
- Cable cinch with four groups of RJ45 cables
- Cable cinch with five groups of RJ45 cables
- Cable cinch with six groups of RJ45 cables
- Cable cinch with seven groups of RJ45 cables
- Cable cinch with eight groups of RJ45 cables
- Connecting a Router to a Network Device
- Managing Routers and Modules
- Managing the device
- Enabling and disabling a DC Power Source
- Disabling and re-enabling power to interface modules
- Monitoring I2C failures on management modules
- Displaying device status and temperature readings
- Displaying the Syslog configuration and static and dynamic buffers
- MP Presence from LP Detection (Headless Router Operation)
- Rolling Reboot
- Line Module Configuration Deletion in Interactive Boot Mode
- Managing switch fabric modules
- Managing the cooling system
- Managing interface modules
- Monitoring Link Status
- Using alarms to collect and monitor device status
- Displaying MR2 management module memory usage
- Enabling and disabling management module CPU usage calculations
- Displaying management module CPU usage
- Removing MAC address entries
- Simplified Upgrade
- Managing the device
- Maintenance and Field Replacement
- Hardware Specifications
- Regulatory Statements
- Caution and Danger Notices
Brocade MLX Series and Brocade NetIron XMR Installation Guide 103
53-1004195-03
Installing a Brocade MLX-32 router
are designed for use as intra-building interfaces only (Type 2 or Type 4 ports as described in
GR-1089-CORE, Issue 5) and require isolation from the exposed OSP cabling. The addition of Primary
Protectors is not sufficient protection in order to connect these interfaces metallically to OSP wiring.
If you do not install a module in a slot, you must leave the slot blank installed in the slot. If you operate the
router with an uncovered slot, the system may overheat.
Before plugging a cable to any port, be sure to discharge any static charge stored on the cable by touching
the electrical contacts to ground surface.
NOTE
Brocade MLX modules are dedicated, which means that you must install them in the Brocade MLX routers only. If you install a
Brocade MLX module in another Brocade device or install a module intended for another Brocade device in a Brocade MLX
router, the router and module will not function properly.
Although management modules are designed to be hot-swappable, you must upgrade the software on all interface modules and
management modules to the appropriate software release before installing them. For more information on the appropriate
software release, refer to the Hardware Installation Notes that shipped with the management module.
If you are installing a redundant management module, refer to the chapter titled “Using a Redundant Management Module” in the Brocade
MLX Series and Brocade NetIron Family Configuration Guide for information about how the redundant module works, optional software
configurations that you can perform, and how to manage the redundancy feature.
For information about how to disable and re-enable power to interface modules, see “Disabling and re-enabling power to interface
modules” on page 213
Before installing modules in the Brocade MLX-32 router, have the following items available:
•
A large flat-blade screwdriver.
•
An ESD wrist strap with a plug for connection to the ESD connector on the Brocade MLX-32 router.
For safety reasons, the ESD wrist strap should contain a 1 megohm series resistor.
If you are hot-swapping a module, allow a minimum of two seconds after a module (or power supply or fan
tray) has been removed before inserting a module in the same slot.
Follow this procedure to install a module in the Brocade MLX router.