Installation Guide

Table Of Contents
7. Select the rail extender that is appropriate for the depth of your EIA rack and attach it to the front of the top rail. Install the top rail
to the EIA rack rails using four 10-32 screws. Attach the top rail to the duct assembly using two 6-32 at-head screws, as
shown in the following gure.
FIGURE 50 Install top rails to the rack
1 Rail extender
Mounting the MLX-4, MLX-8 or MLX-16 router in a 4-post rack or EIA rack
Extreme Routing MLX Series Hardware Installation Guide
126 9035627-01