Installation Guide
Table Of Contents
- Extreme Routing MLX Series Hardware Installation Guide
- Preface
- About This Document
- Product Overview
- ExtremeRouting MLX Series device overview
- MLX Series router applications
- Hardware features
- MLX Series router modules
- Management modules
- Interface modules
- 2x100GbE CFP2 optics based high density module
- PBIF Recovery
- 2x100GbE CFP2 P2010 specifications
- 2x100GbE CFP2 DDR3 SDRAM memory specifications
- BR-MLX-10GX20-X2 and BR-MLX-100GX2-CFP2-X2 Router Software
- BR-MLX-10GX20-X2 and BR-MLX-100GX2-CFP2-X2 scalability for IPv4 and IPv6 routes
- MLX Series 2x100G XPP ILKN monitoring
- MLX Series CPU threshold monitoring
- MLX Series BR-MLX-10Gx4-M IPsec and IKEv2
- MLX Series Encryption and Decryption of IPv4 Unicast Data and Control Packets
- MLX Series IKEv2 Authentication
- MLX Series IPsec and IKEv2 configuration
- MLX Series Configuring Global IKEv2 Options
- MLX Series Configuring the IKEv2 Proposal
- MLX Series Configuring the IKEv2 Policy
- MLX Series Configuring the IKEv2 Profile
- MLX Series Configuring the IKEv2 authentication proposal
- MLX Series Configuring the IPsec Proposal
- MLX Series Configuring the IPsec Profile
- MLX Series IKEv2 Show Commands
- MLX Series IKEv2 Clear Commands
- MLX-10GX4-IPSEC-M Forwarding
- MLX Series 2x100G XPP ILKN monitoring
- 10Gx24-port interface module
- MLX 24-port 10Gbps (BR-MLX-10Gx24-DM) Interface Modules
- 8x10GE-X interface modules
- Gen-1 10Gx2 and 10Gx4 Ethernet interface modules
- BR-MLX-10GX4-X and BR-MLX-10Gx4-X-ML interface module LEDs
- Gen-1.1 4-port 10 Gbps Ethernet interface modules
- 8-port 10 Gbps M and D interface modules
- 24-port 1 Gbps Ethernet copper RJ-45 interface module
- 24-port 1 Gbps fiber interface module
- 20-port 100/1000 Ethernet interface module
- 20-port 10/100/1000 Ethernet interface module
- NI-MLX-1Gx48-T-A interface module
- BR-MLX-40Gx4-M 4-port 40GbE module
- Auto-tuning links
- Forward Error Correction mode
- Switch fabric modules
- High-speed switch fabric modules
- CFP2 to QSFP28 conversion module
- Power supplies
- Rack mounting brackets
- Cooling system for MLX Series routers
- NIBI-16-FAN-EXH-A high-speed fan assemblies
- Rack mount kit
- Supported software features
- Installing an ExtremeRouting MLX Series device
- Pre-Installation notice for the ExtremeRouting MLX chassis bundles
- Installation precautions
- Installing 2x100GbE CFP2 interface modules
- Installing BR-MLX-10Gx24-DM interface modules
- Installing an MLXe-4 router
- Installing an MLX-8 router
- Installing an MLXe-16 router
- Mounting the MLX-4, MLX-8 or MLX-16 router in a 4-post rack or EIA rack
- Installing an MLXe-32 router
- Preparing the installation site
- MLXe-32 router shipping carton contents
- Unpacking your MLXe-32 router
- Installing an MLXe-32 router in an EIA rack
- Installing modules in the MLXe-32 router
- MLXe-32 router cable management
- Accessing modules for service
- Installing power supplies in an MLXe-32 router
- Connecting AC power
- Connecting DC power
- Removing the MLXe-32 router DC power supplies
- Final steps
- Attaching a management station
- Activating the power source
- Verifying proper operation
- Using Extreme Structured Cabling Components
- Cable cinch overview
- mRJ21 procedures
- RJ-45 procedures
- Cable cinch with one group of RJ-45 cables
- Cable cinch with two groups of RJ-45 cables
- Cable cinch with three groups of RJ-45 cables
- Cable cinch with four groups of RJ-45 cables
- Cable cinch with five groups of RJ-45 cables
- Cable cinch with six groups of RJ-45 cables
- Cable cinch with seven groups of RJ-45 cables
- Cable cinch with eight groups of RJ-45 cables
- Connecting a Router to a Network Device
- Managing Routers and Modules
- Managing the device
- Disabling and re-enabling power to interface modules
- Monitoring I2C failures on management modules
- Displaying device status and temperature readings
- Displaying the Syslog configuration and static and dynamic buffers
- Router Headless State by MP Presence from LP
- Rolling Reboot
- Line Module Configuration Deletion in Interactive Boot Mode
- Managing switch fabric modules
- Managing the cooling system
- Managing interface modules
- Configuring interface module boot parameters
- Synchronizing the software image between management modules and interface modules
- Changing the boot source
- Specifying an immediate boot
- Specifying an immediate boot from the auxiliary flash slots on the management module
- Specifying an immediate boot from management module flash memory
- Specifying an immediate boot from flash memory on the interface module
- Specifying an immediate boot from a TFTP server
- Specifying an immediate interactive boot
- Configuring an automatic boot
- Configuring an automatic boot from the auxiliary flash slot on the management module
- Configuring an automatic boot from flash memory on the management module
- Configuring an automatic boot from flash memory on the interface module
- Configuring an automatic boot from a TFTP server
- Configuring an automatic interactive boot
- Changing priority of slots for interface modules
- Disabling and re-enabling power to interface modules
- Configuring interface module boot parameters
- Monitoring Link Status
- Traffic Manager XPP link monitoring
- Using alarms to collect and monitor device status
- Displaying MR2 management module memory usage
- Enabling and disabling management module CPU usage calculations
- Displaying management module CPU usage
- Removing MAC address entries
- IPv6 ND Proxy
- DRBG Health Test on IPsec LP
- Managing the device
- Maintenance and Field Replacement
- Maintenance and field replacement overview
- Hardware maintenance schedule
- Replacing a management module
- Replacing an interface module
- Replacing a switch fabric module
- Replacing a fiber-optic transceiver
- Replacing a power supply
- Replacing fan assemblies
- Hardware Specifications
- ExtremeRouting MLX Series Chassis Bundles
- Regulatory Statements
- Caution and Danger Notices
NOTE
This equipment is suitable for installation in a Network Telecommunication facility and where NEC requirements apply.
Additionally, it may be installed in either a Common Bonding Network (CBN) or Isolated Bonding Network (IBN). It is not
intended for Outside Plant (OSP) installations.
Ensure that the proper cabling is installed at the site.
For information on cabling, refer to Installing power supplies in an MLXe-4 router on page 99, Attaching a management station on
page 171, and Connecting the router to a network device on page 197.
Unpacking an MLXe-4 router
The MLXe-4 router ships with the following items:
• Router chassis with switch fabric modules installed in slots marked SF, slot blanks installed in all empty module slots, and
mounting brackets attached for front-mount.
• Insertion or extraction tool for use with RJ-45 and
ber-optic connectors.
NOTE
If any items are missing, contact the place of purchase.
Follow these steps to unpack your MLXe-4 router.
1. Remove the router from the shipping carton.
2. Save the shipping carton and packing materials in case you need to move or ship the router at a later time.
Installing an MLXe-4 router in an EIA rack
Your MLXe-4 router ships from the factory with mounting brackets attached. You can mount your router in the following ways:
• Front-mount in a standard two-post rack using the factory-installed brackets.
• Mid-mount in a standard two-post rack by moving the factory-installed brackets to the center of the device
• Mount the device in a four-post EIA rack using the EIA Rack Mount Kit. Refer to Installing MLXe-4 and MLXe-8 routers in a 4-
post EIA rack on page 121.
NOTE
Because of the weight of a fully loaded MLXe-4 router, Extreme Networks recommends mounting it in a rack before installing
the modules and AC power supplies.
You can install up to eight MLXe-4 routers in a standard 19-inch (EIA310-D) two-post rack using the factory-installed mounting
brackets for either front- or mid-mounts.
Mounting your device in a standard 2-post rack
The factory-installed mounting brackets allow you to front-mount or mid-mount your device in the rack. For a mid-mount, you must
remove the factory installed brackets from the front edge of the device and install them using the holes in the center-sides of the device.
Refer to Figure 29.
You will need to provide four standard #12-24 pan-head screws (per router) to secure routers in the rack. You will also need a #2
Phillips screwdriver. Complete the following steps.
Installing an MLXe-4 router
Extreme Routing MLX Series Hardware Installation Guide
94 53-1004203-04