Installation Guide

Table Of Contents
FIGURE 78 Routing upper-left quadrant cables up
1. Upper left quadrant
2. Comb B (slot #5 and #6 cables)
3. Comb C (slot #7 and #8 cables)
4. Comb A (slot #3 and #4 cables)
2. Route cables from slots #3 and #4 up through comb A, as showin in the previous gure.
3. Route cables from slots #5 and #6 up through comb B.
4. Route cables from slots #7 and #8 up through comb C.
Installing an MLXe-32 router
Extreme Routing MLX Series Hardware Installation Guide
53-1004203-04 159