Installation Guide
Table Of Contents
- Extreme Routing MLX Series Hardware Installation Guide
- Preface
- About This Document
- Product Overview
- ExtremeRouting MLX Series device overview
- MLX Series router applications
- Hardware features
- MLX Series router modules
- Management modules
- Interface modules
- 2x100GbE CFP2 optics based high density module
- PBIF Recovery
- 2x100GbE CFP2 P2010 specifications
- 2x100GbE CFP2 DDR3 SDRAM memory specifications
- BR-MLX-10GX20-X2 and BR-MLX-100GX2-CFP2-X2 Router Software
- BR-MLX-10GX20-X2 and BR-MLX-100GX2-CFP2-X2 scalability for IPv4 and IPv6 routes
- MLX Series 2x100G XPP ILKN monitoring
- MLX Series CPU threshold monitoring
- MLX Series BR-MLX-10Gx4-M IPsec and IKEv2
- MLX Series Encryption and Decryption of IPv4 Unicast Data and Control Packets
- MLX Series IKEv2 Authentication
- MLX Series IPsec and IKEv2 configuration
- MLX Series Configuring Global IKEv2 Options
- MLX Series Configuring the IKEv2 Proposal
- MLX Series Configuring the IKEv2 Policy
- MLX Series Configuring the IKEv2 Profile
- MLX Series Configuring the IKEv2 authentication proposal
- MLX Series Configuring the IPsec Proposal
- MLX Series Configuring the IPsec Profile
- MLX Series IKEv2 Show Commands
- MLX Series IKEv2 Clear Commands
- MLX-10GX4-IPSEC-M Forwarding
- MLX Series 2x100G XPP ILKN monitoring
- 10Gx24-port interface module
- MLX 24-port 10Gbps (BR-MLX-10Gx24-DM) Interface Modules
- 8x10GE-X interface modules
- Gen-1 10Gx2 and 10Gx4 Ethernet interface modules
- BR-MLX-10GX4-X and BR-MLX-10Gx4-X-ML interface module LEDs
- Gen-1.1 4-port 10 Gbps Ethernet interface modules
- 8-port 10 Gbps M and D interface modules
- 24-port 1 Gbps Ethernet copper RJ-45 interface module
- 24-port 1 Gbps fiber interface module
- 20-port 100/1000 Ethernet interface module
- 20-port 10/100/1000 Ethernet interface module
- NI-MLX-1Gx48-T-A interface module
- BR-MLX-40Gx4-M 4-port 40GbE module
- Auto-tuning links
- Forward Error Correction mode
- Switch fabric modules
- High-speed switch fabric modules
- CFP2 to QSFP28 conversion module
- Power supplies
- Rack mounting brackets
- Cooling system for MLX Series routers
- NIBI-16-FAN-EXH-A high-speed fan assemblies
- Rack mount kit
- Supported software features
- Installing an ExtremeRouting MLX Series device
- Pre-Installation notice for the ExtremeRouting MLX chassis bundles
- Installation precautions
- Installing 2x100GbE CFP2 interface modules
- Installing BR-MLX-10Gx24-DM interface modules
- Installing an MLXe-4 router
- Installing an MLX-8 router
- Installing an MLXe-16 router
- Mounting the MLX-4, MLX-8 or MLX-16 router in a 4-post rack or EIA rack
- Installing an MLXe-32 router
- Preparing the installation site
- MLXe-32 router shipping carton contents
- Unpacking your MLXe-32 router
- Installing an MLXe-32 router in an EIA rack
- Installing modules in the MLXe-32 router
- MLXe-32 router cable management
- Accessing modules for service
- Installing power supplies in an MLXe-32 router
- Connecting AC power
- Connecting DC power
- Removing the MLXe-32 router DC power supplies
- Final steps
- Attaching a management station
- Activating the power source
- Verifying proper operation
- Using Extreme Structured Cabling Components
- Cable cinch overview
- mRJ21 procedures
- RJ-45 procedures
- Cable cinch with one group of RJ-45 cables
- Cable cinch with two groups of RJ-45 cables
- Cable cinch with three groups of RJ-45 cables
- Cable cinch with four groups of RJ-45 cables
- Cable cinch with five groups of RJ-45 cables
- Cable cinch with six groups of RJ-45 cables
- Cable cinch with seven groups of RJ-45 cables
- Cable cinch with eight groups of RJ-45 cables
- Connecting a Router to a Network Device
- Managing Routers and Modules
- Managing the device
- Disabling and re-enabling power to interface modules
- Monitoring I2C failures on management modules
- Displaying device status and temperature readings
- Displaying the Syslog configuration and static and dynamic buffers
- Router Headless State by MP Presence from LP
- Rolling Reboot
- Line Module Configuration Deletion in Interactive Boot Mode
- Managing switch fabric modules
- Managing the cooling system
- Managing interface modules
- Configuring interface module boot parameters
- Synchronizing the software image between management modules and interface modules
- Changing the boot source
- Specifying an immediate boot
- Specifying an immediate boot from the auxiliary flash slots on the management module
- Specifying an immediate boot from management module flash memory
- Specifying an immediate boot from flash memory on the interface module
- Specifying an immediate boot from a TFTP server
- Specifying an immediate interactive boot
- Configuring an automatic boot
- Configuring an automatic boot from the auxiliary flash slot on the management module
- Configuring an automatic boot from flash memory on the management module
- Configuring an automatic boot from flash memory on the interface module
- Configuring an automatic boot from a TFTP server
- Configuring an automatic interactive boot
- Changing priority of slots for interface modules
- Disabling and re-enabling power to interface modules
- Configuring interface module boot parameters
- Monitoring Link Status
- Traffic Manager XPP link monitoring
- Using alarms to collect and monitor device status
- Displaying MR2 management module memory usage
- Enabling and disabling management module CPU usage calculations
- Displaying management module CPU usage
- Removing MAC address entries
- IPv6 ND Proxy
- DRBG Health Test on IPsec LP
- Managing the device
- Maintenance and Field Replacement
- Maintenance and field replacement overview
- Hardware maintenance schedule
- Replacing a management module
- Replacing an interface module
- Replacing a switch fabric module
- Replacing a fiber-optic transceiver
- Replacing a power supply
- Replacing fan assemblies
- Hardware Specifications
- ExtremeRouting MLX Series Chassis Bundles
- Regulatory Statements
- Caution and Danger Notices
Preparing the installation site
Before installation, plan the location and orientation of the device relative to other equipment in the rack. For cooling purposes, allow a
minimum of six inches of space between the front and back of the device, and walls or other obstructions.
Because you will need to use a mechanical lift to move and install the device, make sure you allow enough space to operate the lift. You
will also need at least two people to slide the router o the lift and into the rack.
Preliminary EIA rack mount installation steps
Follow these initial steps to mount a 32-slot device in any EIA rack. To install your device in a 2-post EIA rack (not recommended), refer
to Installing your MLXe-32 router in a 2-post EIA rack on page 138. To install your device in a 4-post EIA rack, refer to Installing your
MLXe-32 outer in a 4-post EIA rack on page 143.
1. Ensure the rack is in a permanent location and is secured to the building. Ensure that the installation site allows adequate
clearance for airow, installation, and maintenance.
2. Move the pallet and router as close to the installation site as possible.
3. Remove the chassis from the shipping pallet.
4. Position the mechanical lift equipped with a lift plate as close to the front of the router as possible. Adjust the lift plate height so
that it is even with the bottom of the router.
5. Slide the router onto the lift plate.
DANGER
Do not attempt to lift an ExtremeRouting MLX-32 chassis. It is extremely heavy. REMOVE THE POWER
SUPPLIES AND INTERFACE MODULES FIRST (management, switch fabric, and all line cards). Use a
mechanical lifting device to lift the chassis. Four or more people are required to position the unpopulated chassis
into the rack.
CAUTION
To prevent damage to the chassis and components, never attempt to lift the chassis using the fan or power supply
handles. These handles were not designed to support the weight of the chassis.
6. Secure the router to the mechanical lift with a strap to prevent tipping.
7. Carefully position the router in front of the rack where it is to be installed.
NOTE
Make sure your site provides 200-240V power.
Installing your MLXe-32 router in a 2-post EIA rack
NOTE
Because of the weight of a fully-populated 32-slot chassis, it is not recommended that you install your 32-slot router in a 2-
post EIA rack. The preferred installation is in a 4-post EIA rack. Refer to Installing your MLXe-32 outer in a 4-post EIA rack on
page 143 for installation instructions
You can install your 32-slot device in a 2-post EIA rack in either a front-mount conguration or a mid-mount conguration using the
factory-installed mounting brackets. For a mid-mount conguration, simply remove the factory-installed mounting brackets from the
front edges of the device and re-attach them to the center sides of the device using the pre-drilled holes.
Installing an MLXe-32 router
Extreme Routing MLX Series Hardware Installation Guide
138 53-1004203-04