Installation Guide

Table Of Contents
2. Use a power drill with Phillips and large at-blade screwdriver attachments to remove the bolts and screws that hold the front
shipping crate panel in place, as shown in the following gure. Remove the front panel and set it aside.
FIGURE 60 Removing bolts and screws and the front panel of the shipping crate
3. Remove the remaining bolts and screws that attach the bottom of the crate to the pallet.
4. Slide the sides, top, and back of the crate backwards as one unit until it clears the pallet.
5. Save the crate (including the shipping panel) in case the router needs to be shipped again.
Installing an MLXe-32 router in an EIA rack
DANGER
Make sure the rack housing the device is adequately secured to prevent it from becoming unstable or falling over.
DANGER
Mount the devices you install in a rack as low as possible. Place the heaviest device at the bottom and progressively place
lighter devices above.
Installing an MLXe-32 router
Extreme Routing MLX Series Hardware Installation Guide
136 53-1004203-04