Installation Guide

Table Of Contents
8. Attach the cable management comb as shown in the following gure. For cable management instructions, refer to MLXe-32
router cable management on page 156.
FIGURE 59 Attach the cable management comb
NOTE
Repeat these steps for each router you install in the EIA rack.
Installing an MLXe-32 router
This section describes how to install an MLXe-32 router.
NOTE
Illustrations in this chapter may dier slightly from the actual
equipment.
Preparing the installation site
Before installing the router, plan the location and orientation relative to other devices and equipment. For cooling purposes, allow a
minimum of six inches of space between the sides, front, and the back of the router and walls or other obstructions. If a router is installed
within a perforated enclosure, the perforations must cover at least 60 percent of the surface.
NOTE
This equipment is suitable for installation in a Network Telecommunication facility and where NEC requirements apply.
Additionally, it may be installed in either a Common Bonding Network (CBN) or Isolated Bonding Network (IBN). It is not
intended for Outside Plant (OSP) installations.
You will need to use a mechanical lift to move and install the router. Be sure to allow enough working room for the lift.
Installing an MLXe-32 router
Extreme Routing MLX Series Hardware Installation Guide
134 53-1004203-04