Installation Guide

Table Of Contents
Installing an MLX-8 router
This section describes how to install an MLX-8 router.
NOTE
Illustrations in this chapter may dier slightly from the actual
equipment.
Preparing the installation site
Before installing the router, plan the location and orientation relative to other devices and equipment. For cooling purposes, allow a
minimum of six inches of space between the sides, front, and the back of the router and walls or other obstructions. If a router is installed
in a perforated enclosure, the perforations must cover at least 60 percent of the surface.
NOTE
This equipment is suitable for installation in a Network Telecommunication facility and where NEC requirements apply.
Additionally, it may be installed in either a Common Bonding Network (CBN) or Isolated Bonding Network (IBN). It is not
intended for Outside Plant (OSP) installations.
Ensure that the proper cabling is installed at the site.
For information on cabling, refer to Installing power supplies in the MLXe-8 router on page 107, Attaching a management station on
page 171, and Connecting the router to a network device on page 197.
Unpacking an MLXe-8 router
The MLXe-8 router ships with the following items:
Switch fabric modules installed in slots marked SF, and slot blanks installed in all empty module slots.
Two AC or two DC power supplies
Insertion or extraction tool for use with RJ-45 and ber-optic connectors.
Save the shipping carton and packing materials in case you need to move or ship the router at a later time.
Lifting guidelines for MLXe-8 routers
Follow these guidelines for lifting and moving MLXe-8 routers:
Before lifting or moving the router, disconnect all external cables.
Do not attempt to lift a fully congured router by yourself.
It is recommended that you install router components after you have installed the router in a rack.
Installing an MLXe-8 router in an EIA rack
Because of the weight of a fully loaded MLXe-8 router, Extreme Networks recommends mounting it in a rack before installing the
modules and AC power supplies.
You can install up to six MLXe-8 routers in a standard 19-inch (EIA310-D) rack using the standard rack installation method. If you use
the EIA rack mounting kit, you can install up to 4 MLXe-8 routers in a standard 19-inch rack.
Installing an MLX-8 router
Extreme Routing MLX Series Hardware Installation Guide
53-1004203-04 103