Installation Guide
Table Of Contents
- Brocade NetIron MLXe Series Hardware Installation Guide
- Preface
- About This Document
- Product Overview
- Brocade router overview
- Router applications
- Hardware features
- Router modules
- Management modules
- Interface modules
- 2x100GbE CFP2 optics based high density module
- PBIF Recovery
- 2x100GbE CFP2 P2010 specifications
- 2x100GbE CFP2 DDR3 SDRAM memory specifications
- BR-MLX-10GX20-X2 and BR-MLX-100GX2-CFP2-X2 Router Software
- BR-MLX-10GX20-X2 and BR-MLX-100GX2-CFP2-X2 scalability for IPv4 and IPv6 routes
- 2x100G XPP ILKN monitoring
- CPU threshold monitoring
- MLXe BR-MLX-10Gx4-M IPsec and IKEv2
- Encryption and Decryption of IPv4 Unicast Data and Control Packets
- IKEv2 Authentication
- IPsec and IKEv2 configuration
- Configuring Global IKEv2 Options
- Configuring the IKEv2 Proposal
- Configuring the IKEv2 Policy
- Configuring the IKEv2 Profile
- Configuring the IKEv2 authentication proposal
- Configuring the IPsec Proposal
- Configuring the IPsec Profile
- IKEv2 Show Commands
- IKEv2 Clear Commands
- MLX-10GX4-IPSEC-M Forwarding
- 2x100G XPP ILKN monitoring
- 10Gx24-port interface module
- MLX 24-port 10Gbps (BR-MLX-10Gx24-DM) Interface Modules
- 8x10GE-X interface modules
- Gen-1 10Gx2 and 10Gx4 Ethernet interface modules
- BR-MLX-10GX4-X and BR-MLX-10Gx4-X-ML interface module LEDs
- Gen-1.1 4-port 10 Gbps Ethernet interface modules
- 8-port 10 Gbps M and D interface modules
- 24-port 1 Gbps Ethernet copper RJ-45 interface module
- 24-port 1 Gbps fiber interface module
- 20-port 100/1000 Ethernet interface module
- 20-port 10/100/1000 Ethernet interface module
- NI-MLX-1Gx48-T-A interface module
- BR-MLX-40Gx4-M 4-port 40GbE module
- Auto-tuning links
- Forward Error Correction mode
- Switch fabric modules
- High-speed switch fabric modules
- CFP2 to QSFP28 conversion module
- Power supplies
- Rack mounting brackets
- Cooling system for Brocade MLXe Series routers
- NIBI-16-FAN-EXH-A high-speed fan assemblies
- Rack mount kit
- Supported software features
- Installing a Brocade MLXe Router
- Pre-Installation notice for the Brocade MLXe chassis bundles
- Installation precautions
- Installing 2x100GbE CFP2 interface modules in Brocade MLXe Series routers
- Installing BR-MLX-10Gx24-DM interface modules in Brocade MLXe Series routers
- Installing a Brocade MLXe Series-4 router
- Installing a Brocade MLXe Series-8 router
- Installing a Brocade MLXe Series-16 router
- Mounting Brocade MLXe Series-4, -8, or -16 routers in a 4-post EIA rack
- Installing a Brocade MLXe Series-32 router
- Preparing the installation site
- Brocade MLXe Series-32 router shipping carton contents
- Unpacking your Brocade MLXe Series-32 router
- Installing a Brocade MLXe Series-32 router in an EIA rack
- Installing modules in the Brocade MLXe Series-32 router
- Brocade MLXe Series-32 cable management
- Accessing modules for service
- Installing power supplies in a Brocade MLXe Series-32 router
- Connecting AC power
- Connecting DC power
- Removing Brocade MLXe Series-32 router DC power supplies
- Final steps
- Attaching a management station
- Activating the power source
- Verifying proper operation
- Using Brocade Structured Cabling Components
- Cable cinch overview
- mRJ21 procedures
- RJ-45 procedures
- Cable cinch with one group of RJ-45 cables
- Cable cinch with two groups of RJ-45 cables
- Cable cinch with three groups of RJ-45 cables
- Cable cinch with four groups of RJ-45 cables
- Cable cinch with five groups of RJ-45 cables
- Cable cinch with six groups of RJ-45 cables
- Cable cinch with seven groups of RJ-45 cables
- Cable cinch with eight groups of RJ-45 cables
- Connecting a Router to a Network Device
- Managing Routers and Modules
- Managing the device
- Disabling and re-enabling power to interface modules
- Monitoring I2C failures on management modules
- Displaying device status and temperature readings
- Displaying the Syslog configuration and static and dynamic buffers
- Router Headless State by MP Presence from LP
- Rolling Reboot
- Line Module Configuration Deletion in Interactive Boot Mode
- Managing switch fabric modules
- Managing the cooling system
- Managing interface modules
- Configuring interface module boot parameters
- Synchronizing the software image between management modules and interface modules
- Changing the boot source
- Specifying an immediate boot
- Specifying an immediate boot from the auxiliary flash slots on the management module
- Specifying an immediate boot from management module flash memory
- Specifying an immediate boot from flash memory on the interface module
- Specifying an immediate boot from a TFTP server
- Specifying an immediate interactive boot
- Configuring an automatic boot
- Configuring an automatic boot from the auxiliary flash slot on the management module
- Configuring an automatic boot from flash memory on the management module
- Configuring an automatic boot from flash memory on the interface module
- Configuring an automatic boot from a TFTP server
- Configuring an automatic interactive boot
- Changing priority of slots for interface modules
- Disabling and re-enabling power to interface modules
- Configuring interface module boot parameters
- Monitoring Link Status
- Traffic Manager XPP link monitoring
- Using alarms to collect and monitor device status
- Displaying MR2 management module memory usage
- Enabling and disabling management module CPU usage calculations
- Displaying management module CPU usage
- Removing MAC address entries
- IPv6 ND Proxy
- DRBG Health Test on IPsec LP
- Managing the device
- Maintenance and Field Replacement
- Maintenance and field replacement overview
- Hardware maintenance schedule
- Replacing a management module
- Replacing an interface module
- Replacing a switch fabric module
- Replacing a fiber-optic transceiver
- Replacing a power supply
- Replacing fan assemblies
- Hardware Specifications
- Brocade MLXe Chassis Bundles
- Regulatory Statements
- Caution and Danger Notices
Managing Routers and Modules
∙ Managing the device...................................................................................................................................................................................................... 197
∙ Managing switch fabric modules..........................................................................................................................................................................205
∙ Managing the cooling system................................................................................................................................................................................ 206
∙ Managing interface modules.....................................................................................................................................................................................214
∙ Monitoring Link Status................................................................................................................................................................................................220
∙ Traffic Manager XPP link monitoring..................................................................................................................................................................222
∙ Using alarms to collect and monitor device status.....................................................................................................................................223
∙ Displaying MR2 management module memory usage..........................................................................................................................228
∙ Enabling and disabling management module CPU usage calculations........................................................................................ 228
∙ Displaying management module CPU usage...............................................................................................................................................229
∙ Removing MAC address entries...........................................................................................................................................................................230
∙ IPv6 ND Proxy.................................................................................................................................................................................................................. 231
∙ DRBG Health Test on IPsec LP............................................................................................................................................................................ 238
Managing the device
You can perform these management tasks for the router:
∙ Enable and disable a DC power source, if necessary.
∙ Display status and temperatures of all hardware components.
∙ Display the Syslog configuration and static and dynamic buffers.
∙ Disable and re-enable power to interface modules.
Disabling and re-enabling power to interface modules
You can disable power and re-enable power to all interface modules, or to a specified interface module using the power-off command in
the CLI, as shown in the following example:
device# power-off lp all
Syntax: power-off lp [all|
slot-number
]
∙ all - disables power to all interface modules
∙
slot-number
- disables power to the interface module in the specified slot. You can specify 1-4 for 4-slot routers, 1-8 for 8-slot
routers, 1-16 for 16-slot routers, and 1-32 for 32-slot routers.
NOTE
It is recommended that you do not disable power to interface modules during a software upgrade. If you try to disable power
during a software upgrade, the following message will be displayed:Warning: There is an outstanding software
download.Do you want to continue ? (enter "y" or "n") Type "n " and wait until the upgrade is complete.
To re-enable power to all interfaces or to a specific interface, enter the power-on lp command, as shown in this example:
device# power-on lp
Syntax: power-on lp [
slot-number
|all ]
∙ all - enables power to all interface modules
Brocade NetIron MLXe Series Hardware Installation Guide
53-1004203-03 197