Installation Guide

Table Of Contents
FIGURE 80 Routing upper-right quadrant cables up
1. Upper right quadrant
2. Comb B (slot #11 and #12 cables)
3. Comb C (slot #9 and #10 cables)
4. Comb A (slot #13 and #14 cables)
2. Route cables from slots #13 and #14 up through comb A, as shown in the previous figure.
3. Route cables from slots #11 and #12 up through comb B.
4. Route cables from slots #9 and #10 up through comb C.
Cable routing for the lower-left quadrant
1. Route cables from slots #18 and #17 directly to the left through the side comb, as shown in the following figure.
Installing a Brocade MLXe Router
Brocade NetIron MLXe Series Hardware Installation Guide
158 53-1004203-03