Installation Guide

Table Of Contents
FIGURE 37 The Brocade MLXe Series DC 1200W power supply
1. Screws holding transparent cover 2. Power lug screws
FIGURE 38 The Brocade MLXe Series DC 1800W power supply
1. Screws holding transparent cover
2. Power lug screws
2. Use a #2 Phillips screwdriver to remove the power lugs.
3. Crimp #8 AWG power supply wire into the power lugs and reconnect the lugs to the power supply unit, as shown in the
following figure.
For the NEBS-compliant installation of Brocade MLXe Series-4, Brocade MLXe Series-8, and Brocade MLXe Series-16
routers:
CAUTION
For a Brocade AC system, use a ground wire of at least 6 American Wire Gauge (AWG). The ground wire should have
an agency-approved crimped connector (provided with the chassis) attached to one end, with the other end attached
to building ground. The connector must be crimped with the proper tool, allowing it to be connected to both ground
screws on the enclosure.
Installing a Brocade MLXe Router
Brocade NetIron MLXe Series Hardware Installation Guide
53-1004203-03 109