Installation Guide
Table Of Contents
- Brocade NetIron MLXe Series Hardware Installation Guide
- Preface
- About This Document
- Product Overview
- Brocade router overview
- Router applications
- Hardware features
- Router modules
- Management modules
- Interface modules
- 2x100GbE CFP2 optics based high density module
- PBIF Recovery
- 2x100GbE CFP2 P2010 specifications
- 2x100GbE CFP2 DDR3 SDRAM memory specifications
- BR-MLX-10GX20-X2 and BR-MLX-100GX2-CFP2-X2 Router Software
- BR-MLX-10GX20-X2 and BR-MLX-100GX2-CFP2-X2 scalability for IPv4 and IPv6 routes
- 2x100G XPP ILKN monitoring
- CPU threshold monitoring
- MLXe BR-MLX-10Gx4-M IPsec and IKEv2
- Encryption and Decryption of IPv4 Unicast Data and Control Packets
- IKEv2 Authentication
- IPsec and IKEv2 configuration
- Configuring Global IKEv2 Options
- Configuring the IKEv2 Proposal
- Configuring the IKEv2 Policy
- Configuring the IKEv2 Profile
- Configuring the IKEv2 authentication proposal
- Configuring the IPsec Proposal
- Configuring the IPsec Profile
- IKEv2 Show Commands
- IKEv2 Clear Commands
- MLX-10GX4-IPSEC-M Forwarding
- 2x100G XPP ILKN monitoring
- 10Gx24-port interface module
- MLX 24-port 10Gbps (BR-MLX-10Gx24-DM) Interface Modules
- 8x10GE-X interface modules
- Gen-1 10Gx2 and 10Gx4 Ethernet interface modules
- BR-MLX-10GX4-X and BR-MLX-10Gx4-X-ML interface module LEDs
- Gen-1.1 4-port 10 Gbps Ethernet interface modules
- 8-port 10 Gbps M and D interface modules
- 24-port 1 Gbps Ethernet copper RJ-45 interface module
- 24-port 1 Gbps fiber interface module
- 20-port 100/1000 Ethernet interface module
- 20-port 10/100/1000 Ethernet interface module
- NI-MLX-1Gx48-T-A interface module
- BR-MLX-40Gx4-M 4-port 40GbE module
- Auto-tuning links
- Forward Error Correction mode
- Switch fabric modules
- High-speed switch fabric modules
- CFP2 to QSFP28 conversion module
- Power supplies
- Rack mounting brackets
- Cooling system for Brocade MLXe Series routers
- NIBI-16-FAN-EXH-A high-speed fan assemblies
- Rack mount kit
- Supported software features
- Installing a Brocade MLXe Router
- Pre-Installation notice for the Brocade MLXe chassis bundles
- Installation precautions
- Installing 2x100GbE CFP2 interface modules in Brocade MLXe Series routers
- Installing BR-MLX-10Gx24-DM interface modules in Brocade MLXe Series routers
- Installing a Brocade MLXe Series-4 router
- Installing a Brocade MLXe Series-8 router
- Installing a Brocade MLXe Series-16 router
- Mounting Brocade MLXe Series-4, -8, or -16 routers in a 4-post EIA rack
- Installing a Brocade MLXe Series-32 router
- Preparing the installation site
- Brocade MLXe Series-32 router shipping carton contents
- Unpacking your Brocade MLXe Series-32 router
- Installing a Brocade MLXe Series-32 router in an EIA rack
- Installing modules in the Brocade MLXe Series-32 router
- Brocade MLXe Series-32 cable management
- Accessing modules for service
- Installing power supplies in a Brocade MLXe Series-32 router
- Connecting AC power
- Connecting DC power
- Removing Brocade MLXe Series-32 router DC power supplies
- Final steps
- Attaching a management station
- Activating the power source
- Verifying proper operation
- Using Brocade Structured Cabling Components
- Cable cinch overview
- mRJ21 procedures
- RJ-45 procedures
- Cable cinch with one group of RJ-45 cables
- Cable cinch with two groups of RJ-45 cables
- Cable cinch with three groups of RJ-45 cables
- Cable cinch with four groups of RJ-45 cables
- Cable cinch with five groups of RJ-45 cables
- Cable cinch with six groups of RJ-45 cables
- Cable cinch with seven groups of RJ-45 cables
- Cable cinch with eight groups of RJ-45 cables
- Connecting a Router to a Network Device
- Managing Routers and Modules
- Managing the device
- Disabling and re-enabling power to interface modules
- Monitoring I2C failures on management modules
- Displaying device status and temperature readings
- Displaying the Syslog configuration and static and dynamic buffers
- Router Headless State by MP Presence from LP
- Rolling Reboot
- Line Module Configuration Deletion in Interactive Boot Mode
- Managing switch fabric modules
- Managing the cooling system
- Managing interface modules
- Configuring interface module boot parameters
- Synchronizing the software image between management modules and interface modules
- Changing the boot source
- Specifying an immediate boot
- Specifying an immediate boot from the auxiliary flash slots on the management module
- Specifying an immediate boot from management module flash memory
- Specifying an immediate boot from flash memory on the interface module
- Specifying an immediate boot from a TFTP server
- Specifying an immediate interactive boot
- Configuring an automatic boot
- Configuring an automatic boot from the auxiliary flash slot on the management module
- Configuring an automatic boot from flash memory on the management module
- Configuring an automatic boot from flash memory on the interface module
- Configuring an automatic boot from a TFTP server
- Configuring an automatic interactive boot
- Changing priority of slots for interface modules
- Disabling and re-enabling power to interface modules
- Configuring interface module boot parameters
- Monitoring Link Status
- Traffic Manager XPP link monitoring
- Using alarms to collect and monitor device status
- Displaying MR2 management module memory usage
- Enabling and disabling management module CPU usage calculations
- Displaying management module CPU usage
- Removing MAC address entries
- IPv6 ND Proxy
- DRBG Health Test on IPsec LP
- Managing the device
- Maintenance and Field Replacement
- Maintenance and field replacement overview
- Hardware maintenance schedule
- Replacing a management module
- Replacing an interface module
- Replacing a switch fabric module
- Replacing a fiber-optic transceiver
- Replacing a power supply
- Replacing fan assemblies
- Hardware Specifications
- Brocade MLXe Chassis Bundles
- Regulatory Statements
- Caution and Danger Notices
Installing a Brocade MLXe Series-8 router
This section describes how to install a Brocade MLXe Series-8 router.
NOTE
Illustrations in this chapter may differ slightly from the actual equipment.
Preparing the installation site
Before installing the router, plan the location and orientation relative to other devices and equipment. For cooling purposes, allow a
minimum of six inches of space between the sides, front, and the back of the router and walls or other obstructions. If a router is installed
in a perforated enclosure, the perforations must cover at least 60 percent of the surface.
NOTE
This equipment is suitable for installation in a Network Telecommunication facility and where NEC requirements apply.
Additionally, it may be installed in either a Common Bonding Network (CBN) or Isolated Bonding Network (IBN). It is not
intended for Outside Plant (OSP) installations.
Ensure that the proper cabling is installed at the site.
For information on cabling, refer to Installing power supplies in the Brocade MLXe Series-8 router on page 107, Attaching a
management station on page 168, and Connecting the router to a network device on page 192.
Unpacking a Brocade MLXe Series-8 router
The Brocade MLXe Series-8 router ships with the following items:
∙ Switch fabric modules installed in slots marked SF, and slot blanks installed in all empty module slots.
∙ Two AC or two DC power supplies
∙ Insertion or extraction tool for use with RJ-45 and fiber-optic connectors.
Save the shipping carton and packing materials in case you need to move or ship the router at a later time.
Lifting guidelines for Brocade MLXe Series-8 routers
Follow these guidelines for lifting and moving Brocade MLXe Series-8 routers:
∙ Before lifting or moving the router, disconnect all external cables.
∙ Do not attempt to lift a fully configured router by yourself.
∙ It is recommended that you install router components after you have installed the router in a rack.
Installing a Brocade MLXe Series-8 router in an EIA rack
Because of the weight of a fully loaded Brocade MLXe Series-8 router, Brocade recommends mounting it in a rack before installing the
modules and AC power supplies.
You can install up to six Brocade MLXe Series-8 routers in a standard 19-inch (EIA310-D) rack using the standard rack installation
method. If you use the EIA rack mounting kit, you can install up to 4 Brocade MLXe Series-8 routers in a standard 19-inch rack.
Installing a Brocade MLXe Router
Brocade NetIron MLXe Series Hardware Installation Guide
53-1004203-03 103