Installation Guide

Table Of Contents
3. Verify that the ground wire is attached to the power supply.
See Figure 193 on page 249.
4. Insert a screwdriver into both slots on the top of the terminal connector and loosen the screws
enough to accommodate a stripped power input cable.
5. Insert the DC power cables into the connector.
a. Slide the end of the positive wire (–48 V RTN) into the positive terminal (labeled +, on the left
side of the connector).
b. Tighten the screw on the top of the positive terminal connector to between 4.4 inlb (0.50 N m)
and 7.1 inlb (0.8 N m).
See Figure 194.
Figure 194: Inserting the DC Power Cables into the Connector
c. Slide the end of the negative wire (–48 V) into the negative terminal (labeled , on the right side
of the connector).
d. Tighten the screw on the top of the negative terminal connector to between 4.4 inlb (0.50 N m)
and 7.1 inlb (0.8 N m).
Install an 1100 W Internal DC Power Supply
Installing Your Extreme Networks Switch
250 ExtremeSwitching Hardware Installation Guide