User guide

E
XTREME
W
ARE
S
OFTWARE
U
SER
G
UIDE
6-5
T
YPES
OF
VLAN
S
Figure 6-3: Two port-based VLANs spanning two BlackDiamond switches
VLAN Accounting spans System 1 and System 2 by way of a connection between
System 1, 29 and System 2, slot 3, port 1. VLAN Engineering spans System 1 and System
2 by way of a connection between System 1, port 32, and System 2, slot 7, port 1.
Using this configuration, you can create multiple VLANs that span multiple switches, in
a daisy-chained fashion. Each switch must have a dedicated port for each VLAN. Each
dedicated port must be connected to a port that is a member of its VLAN on the next
switch.
1234AB5678
System 1
EW_030
6
5
4
3
2
1
2
1
6
5
4
3
Accounting
System 2
29 30 31 32
4
12
20
5
13
21
6
14
22
7
15
23
8
16
24
28
3
11
19
27
2
10
18
26
1
9
17
25
Engineering
50015