Deployment Guide
Table Of Contents
- Table of Contents
 - Preface
 - About Extreme Campus Controller Deployment
 - Configuring DHCP, NPS, and DNS Services
 - Centralized Site with a Captive Portal
 - Centralized Site with AAA Network
 - Deploying a Mesh Network
 - Configuring an External NAC Server for MBA and AAA Authentication
 - Manage RADIUS Servers for User Authentication
 - External Captive Portal on a Third-Party Server
 - Access Control Rule Admin Portal Access
 - Deploying Centralized Web Authentication
 - Deploying ExtremeCloud IQ - SE as an External Captive Portal
- Deployment Strategy
 - Configuring an External Captive Portal Network
 - Editing the Configuration Profile for Network and Roles
 - Extreme Campus Controller Default Pass-Through Rule
 - Adding Extreme Campus Controller as a Switch to ExtremeCloud IQ - Site Engine
 - Editing the Unregistered Policy on ExtremeCloud IQ - Site Engine
 - Editing the ExtremeCloud IQ - Site Engine Profile for Policy and Location-Based Services
 
 - Deploying an ExtremeGuest Captive Portal
 - Deploying Client Bridge
 - Deploying an Availability Pair
 - Deploying Universal APs
 - Extreme Campus Controller Pair with ExtremeLocation and AirDefense
 - ECP Local Authentication
 - PHP External Captive Portal, Controller’s Firewall Friendly API
 - Index
 
Virtual Machine Upgrade File Formats:
Note
VE6120, and VE6125 use separate .ova files. You cannot upgrade from one VM model to
another.
Virtual Machine Upgrade File Formats:
• VE6120 — .dle
• VE6125 — .rse
Requirements for the Extreme Campus Controller VE6120 model are listed in Supported Appliance
Specifications on page 14.
For installation information, see VE6120/VE6125 Virtual Appliances Installation Guide VMware® Platform
located in the Extreme Networks documentation portal.
Related Topics
Supported Appliance Specifications on page 14
VE6125 Virtual Appliance on page 13
VE6125 Virtual Appliance
VE6125 targets extra large deployments of up to 4000 access points. The larger capacity oers support
for customers wanting to manage a large deployment from a virtual installation. The VE6125 X-Large
configuration provides capacity parity with the E2120. Customers with large installations of up to 4000
APs have the option to manage their infrastructure via a pair of hardware appliances, the E2120 or in
virtual configuration options, the VE6125:
• Requires a VMWare Enterprise license.
• Uses the same licensing procedure as the VE6120.
• Is entitled per the 30324/30326 activation keys.
• Accepts the same capacity keys as the hardware model E2120.
Note
VE6120, and VE6125 use separate .ova files. You cannot upgrade from one VM model to
another.
Virtual Machine Upgrade File Formats:
• VE6120 — .dle
• VE6125 — .rse
Requirements for the Extreme Campus Controller VE6125 model are listed in Supported Appliance
Specifications on page 14.
For installation information, see VE6120/VE6125 Virtual Appliances Installation Guide VMware® Platform
located in the Extreme Networks documentation portal.
Related Topics
Supported Appliance Specifications on page 14
VE6120 Virtual Appliance on page 12
About Extreme Campus Controller Deployment
VE6125 Virtual Appliance
Extreme Campus Controller Deployment Guide for version 5.46.03 13










