User's Guide

Table Of Contents
The reports are limited to a specific site. Select from the list of configured sites.
Period
Select a period to gather data. Valid values are:
3 Hours
3 Days
14 Days
Format
Specify the output format for this report: PDF.
4. Before running the report, select Save Report Settings.
After you save the Report Settings, the report displays on the Report Settings tab, and it displays in
the Scheduler for Extreme Campus Controller.
5. When running a report, you have the following options:
Run Now. Run the report now.
Scheduling. Schedule the report from the Report Settings tab. Schedule the report using
Scheduler for Extreme Campus Controller.
Note
Scheduling is unavailable until you install and run Scheduler for Extreme Campus
Controller.
Select Scheduling to open the Scheduler application. This is a Docker application that resides on
Extreme Campus Controller. Download Scheduler for Extreme Campus Controller from the
Extreme Networks support portal, and install the application. For more information on installing
Scheduler Application, see Scheduler for Extreme Campus Controller on page 388.
Cancel. To cancel the report. The report settings are not saved.
Related Topics
Schedule Report on page 347
Scheduler for Extreme Campus Controller on page 388
Reports on page 342
Schedule Report
Before you can schedule reports from Extreme Campus Controller:
Download and install Scheduler for Extreme Campus Controller. For more information, see
Scheduler for Extreme Campus Controller on page 388.
Create a report template. For more information, see Create Report Template on page 343.
Note
When integrating Scheduler for Extreme Campus Controller, set Web Session Timeout > 2
hours. If this value is < 2 hours, Scheduler results in a 401 Unauthorized error. To configure
Web Session Timeout, from Extreme Campus Controller, go to Administration > System >
Maintenance.
Tools Schedule Report
Extreme Campus Controller User Guide for version 5.46.03 347