Installation manual

Extreme Networks EAS 200-24p Switch Hardware Installation Manual
17
CHAPTER
2
Installation
Package Contents
Open the shipping carton of the switch and carefully unpack its contents. The carton should contain the
following items:
One EAS 200-24p switch
One RJ-45 to RS-232 console
One mounting kit (two brackets and screws)
Four rubber feet with adhesive backing
If any item is missing or damaged, please contact your local reseller for a replacement.
Installation Guidelines
Please follow these guidelines for setting up the switch:
Install the switch on a sturdy, level surface that can support the weight of the switch. Do not place
heavy objects on the switch.
The power outlet should be within 1.82 meters (6 feet) of the switch.
Visually inspect the power cord and see that it is fully secured to the AC power port.
Make sure that there is proper heat dissipation from and adequate ventilation around the switch.
Leave at least 10 cm (4 inches) of space at the front and rear of the switch for ventilation.
Install the switch in a fairly cool and dry place for the acceptable temperature and humidity
operating ranges.
Install the switch in a site free from strong electromagnetic field generators (such as motors),
vibration, dust, and direct exposure to sunlight.
When installing the switch on a level surface, attach the rubber feet to the bottom of the device. The
rubber feet cushion the switch, protect the casing from scratches and prevent it from scratching other
surfaces.