Installation guide
Consolidated "e" Series Hardware Installation Guide 5
Console Port 53
Port Connections 53
Summit 300 Automatic Failover 53
Summit 300-48 Rear View 54
Load Sharing Power Supplies 55
Chapter 5 Summit 400-48t Switch Overview
Summit 400-48t Switch 57
Summit 400 Front View 57
Summit 400 Rear View 58
Summit 400 Switch LEDs 59
Port Connections 61
Uplink Redundancy 61
Part 3 Switch Installation
Chapter 6 āeā Switch Installation
Installing the Switch 65
Rack Mounting 66
Removing the Switch from a Rack 67
Free-Standing 67
Desktop Mounting of Multiple Switches 67
Installing or Replacing a Mini-Gigabit Interface Connector (Mini-GBIC) 67
Removing and Inserting a Mini-GBIC 68
Connecting Equipment to the Console Port 69
Powering On the SwitchSummit 300-48 switch 70
Checking the InstallationSummit 300-48 switch 70
Logging In for the First Time 71
Part 4 Accessory Installation
Chapter 7 Summit 300 Optional Features
External Power Supply (45019) 75
Rack-mounting the EPS-LD unit 76
Connecting the EPS-LD unit 77
Removing an EPS-LD unit 79
Internal 600 Watt Power Supply (15412) 79
Removing and Installing Summit 300-48 Power Supplies 80
Installing and Removing Power Cable Retaining Brackets 82
Removing the Power Cable Retaining Bracket 84