Installation guide
Table Of Contents
- Table of Contents
- Introduction
- Hardware Installation
- Defining a Basic Configuration
- Specifications
- Regulatory Information
- Regulatory Overview
- Wireless Device Country Approvals
- Health and Safety Recommendations
- RF Exposure Guidelines
- International
- EU
- US and Canada
- Power Supply
- Radio Frequency Interference Requirements – FCC
- Radio Frequency Interference Requirements – Canada
- CE Marking and European Economic Area (EEA)
- Statement of Compliance
- Waste Electrical and Electronic Equipment (WEEE)
- Japan (VCCI) - Voluntary Control Council for Interference Class B ITE
- Korea Warning Statement for Class B ITE
- Other Countries
- Customer Support

Altitude™ 4521 Series Access Point Installation Guide
9
CHAPTER
2
Hardware Installation
Installation Instructions
An Altitude 4521 Series Access Point can attach to a wall, mount under a suspended T-Bar
or mount above a ceiling. Selecting a mounting option based on the physical environment
of the coverage area. Do not mount the Access Point in a location that has not been
approved in a site survey.
To prepare for an installation, perform the following:
1 Verify the contents of the box includes the intended Access Point and accessory
hardware.
2 Review site survey and network analysis reports to determine the location and mounting
position for the Access Point.
3 Connect a CAT-5e or better Ethernet cable to a PoE compatible device and run the cable
to the installation site. Ensure there is sufficient cable slack to perform the installation
steps.