Installation guide

Site Preparation
Summit
®
WM3400 Wireless LAN Controller Installation Guide
7
Identify where all installed components are located.
Verify appropriate rack mounting requirements.
Provide a sufficient number of power drops for your equipment.
Ensure adequate, dust-free ventilation to all installed equipment.
Identify and prepare Ethernet and console port connections.
Verify that cable lengths are within the maximum allowable distances for optimal signal
transmission.
Verify that the Summit WM3400 wireless LAN controller is powered through an Uninterruptible
Power Supply (UPS).