Installation guide
Site Preparation
Summit
®
WM3400 Wireless LAN Controller Installation Guide
7
● Identify where all installed components are located.
● Verify appropriate rack mounting requirements.
● Provide a sufficient number of power drops for your equipment.
● Ensure adequate, dust-free ventilation to all installed equipment.
● Identify and prepare Ethernet and console port connections.
● Verify that cable lengths are within the maximum allowable distances for optimal signal
transmission.
● Verify that the Summit WM3400 wireless LAN controller is powered through an Uninterruptible
Power Supply (UPS).