Specifications

Altitude 3550 Access Point Deployment Guide 23
5 Loosen the gland nut on the power entry fitting.
6 Expose 6 inches of wire from the jacket. Only use wire suited for your specific installation
requirements and application.
Use 3 conductor wire of a gage suitable for the required wire run.
7 Feed the wire through the power fitting. Do not tighten the fitting at this time.
8 Using the solder-less ring terminals, strip and terminate the individual wires.
Expose only sufficient copper (using a solder-less terminal crimping tool) to ensure a good electrical
connection. No exposed copper strands should be visible outside the terminal insulator.