Installation guide

Altitude 3510 Access Point Installation Guide 7
Site Preparation
Consult your site survey and network analysis reports to determine specific
equipment placement, power drops, and so on.
Assign installation responsibility to the appropriate personnel.
Identify and document where all installed components are located.
Provide a sufficient number of power drops for your equipment.
Ensure adequate, dust-free ventilation to all installed equipment.
Identify and prepare Ethernet and console port connections.
Verify that cable lengths are within the maximum allowable distances for optimal
signal transmission.