Installation guide

A
LPINE
3800 S
ERIES
S
WITCH
H
ARDWARE
I
NSTALLATION
G
UIDE
2-7
I
NSTALLING
THE
A
LPINE
3800
SERIES
SWITCH
COMPONENTS
Caution: Support the power supply from the bottom, while holding the central
handle on the front of the power supply unit.
b Use the centrally mounted handle to slide the power supply into the bay. Use the
ejector/injector lever to engage/disengage the power supply connectors during
the last inch of insertion into the chassis.
c Secure the power supply by tightening the screw on the ejector/injector lever
using a #2 Phillips-head screwdriver.
d Slide the locking latch covering the AC power connector to the right or left to
uncover the power connector.
Caution: Be careful not to slam the power supply into the backplane. The power
supply cannot be installed if an AC power cord is plugged in. Damage to the
chassis and power supply may result if an attempt is made to install a power
supply with an AC power cord connected.
2 To install a second power supply, remove the blank plate from the empty power
supply bay using a #1 Phillips-head screwdriver.
3 Install the second power supply, by repeating the procedure described in Step 1.
I
NSTALLING
M
ODULE
C
ARDS
Prior to installing module cards into the Alpine 3804/3808 chassis, put on the ESD wrist
strap that is provided with the chassis, and connect the metal end to the ground
receptacle located on the top-right corner of the switch front panel.
Leave the ESD strap permanently connected to the chassis, so that it is always available
when you need to handle ESD-sensitive components.