Installation guide

6 Extreme Networks Consolidated "e" and "i" Series Hardware Installation Guide
Contents
Console Port 103
Power Supplies 103
Labels 104
Reset Button 104
Summit48si Switch LEDs 105
Chapter 4 Summit Switch Installation
Installation Summary 107
Mounting the Switch in a Rack 108
Placing the Switch on a Table or Shelf 112
Installing a Summit Stacked Configuration 112
Connecting Summit 400 Series Switches 114
Connecting Summit 200 Series and Summit 300-24 Switches 114
Verifying a Successful Installation 114
Removing the Switch from a Rack 115
Chapter 5 Installing and Connecting Summit Power Supplies
Installing or Removing an External Power Supply 45019 (EPS-LD) 118
Rack-mounting the EPS-LD unit 118
Connecting the EPS-LD to the Switch 119
Connecting the EPS-LD to Power 120
Removing an EPS-LD unit 121
Installing and Removing the Internal 600 Watt AC Power Supply (15412) 121
Installing an Internal 600-Watt Power Supply 122
Removing an Internal Power Supply 123
Installing an External Power System for a Summit 400 Switch 124
Rack Mounting the EPS-T 125
Adding a Second EPS-160 to the EPS-T 126
Removing an EPS-160 from the EPS-T 126
Installing and Removing Summit48si AC Power Supplies 127
Power Supply Cords 127
Installing a Summit 48si AC Power Supply 127
Removing a Summit 48si AC Power Supply 128
Installing the AC Power Cable Retaining Bracket 129
Disconnecting a Power Cable with an Installed Cable Retaining Bracket 132
Installing the Summit48si Switch DC Power Supply 132
Preparing and Attaching the DC Power Supply Cable 134
Attaching the Connector to the DC Power Supply 135